Tenders of Integral Coach Factory
Tenders of Integral Coach Factory
Integral Coach Factory - ICF Tender
Machinery and Tools
Ireps
India, India
Closing Date10 Dec 2024
Tender AmountINR 500 K (USD 5.9 K) This is an estimated amount, exact amount may vary.
Supply And Installation Of Traction Motor Under Frame Duct Fixing Arrgt
Integral Coach Factory - ICF Tender
Civil And Construction
Ireps
India, India
Closing Date10 Dec 2024
Tender AmountINR 500 K (USD 5.9 K) This is an estimated amount, exact amount may vary.
Supply And Installation Of Cat Walk Arrangement Over Roof For Panto Area For Emu/us/tc/ac Coaches
Integral Coach Factory - ICF Tender
Automobiles and Auto Parts
Ireps
India, India
Closing Date10 Dec 2024
Tender AmountINR 26.8 Million (USD 317.2 K) This is an estimated amount, exact amount may vary.
End Part For D Coach
Integral Coach Factory - ICF Tender
Automobiles and Auto Parts
Ireps
India, India
Closing Date10 Dec 2024
Tender AmountINR 12.8 Million (USD 151.2 K) This is an estimated amount, exact amount may vary.
31110952 one Coach Set Of End Part For Air Conditioned Emu Trailer Coaches To Drg.
nos. Emu/c/ac-1-1-002, Col-iii, Alt 'c' -1 No. Emu/c/ac-1-1-003, Col-i, Alt 'b' -1 No. Special Condi
tion: I) The Manufacturing Facility Requirement As Per Icf/md/spec-147, Issue Status-01,re
v-02, Amendment No.01. Ii) Body Bolster To Drg.no.icf/mrvc/c/ss-1-1-005, Alt 'h', Col.i To Be
provided Without A)side Bearers To Drg.no.emu/m-1-1-027,alt 'l' Col-ii. B)grubscrews To Dr
g.no.icf/mrvc/c/ss-1-1-005, Alt 'h' Item-8, And C)side Bearer Covers To Drg.no.emu/m-1-1-027,
alt 'l' Item-1. Iii)the Under Frame End Part Should Be Supplied With Normal Side Up And Side
bearer Side Down. Suitable Packing To Be Done To Prevent Damage During Transit, Unloa
ding And Rust Prevention During Storage. [safety Item] [ Warranty Period: 30 Months After T
he Date Of Delivery ]
[quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation
permitted: Max 8 Lacs ] ]
consignee Shell Depot/icf,chennai, Icf Tamil Nadu 25.00 Set
inspection
details Stage Inspection Not Required
Integral Coach Factory - ICF Tender
Scraps
Ireps
India
Closing Date12 Dec 2024
Tender AmountRefer Documents
Scrap Stainless Steel Non-magnetic Finish Of Various Grades Of Shop Refuse Consisting Of Regular,irregular Offcuts Of Sheets And Plates Of All Sorts, Sizes And Designs, Channels, Pipes, Pipe Off-cuts Punchings, Remnants Of Punching,chequered Plate Offcuts, All Rejected /obsolete Fabricated Stainless Steel Items,condemned /obsolete Stainless Steel Seat,panels, Hand Hold Items,luggage And Berth Frames,rejected And Obsolete Stainless Steel Coach Items,condemned Panels, S.s Mouldings And Handles Of All Sorts, Shapes, Obsolete Stainless Steel Fasteners,couplings, Rejected Wash Basins, Unusable To Icf. Note: (1) Any Non-ferrous/plastic Attachments Can Be Removed At The Time Of Delivery (2) Jcb Permitted For Spreading. Gst-18 Percent.other Taxes As Applicable.gst And Any Other Taxes As Imposed By Central Or State Government Will Be To Buyer¿s Account¿ Location: (1) North Peripheral Road At Area Opposite Street Light Pillar No 5 To Street Light Pillar No 6, (2) North Peripheral Road At Area Opposite Street Light Pillar No 8 To Street Light Pillar No 10 Quantity- 8000 Kg.ul No-36 9809 0719 13 14.hsn Code-720421
Integral Coach Factory - ICF Tender
Ireps
India, India
Closing Date9 Oct 2024
Tender AmountINR 500 K (USD 5.9 K) This is an estimated amount, exact amount may vary.
Epdm Brake Pipe Sealing Emu/d
5621-5630 of 5634 archived Tenders