Tenders of Houghton Regis Town Council

Tenders of Houghton Regis Town Council

Sorry!
No Active
Tenders of Houghton Regis Town Council
found
Check archived
Tenders of Houghton Regis Town Council
United Kingdom
1.1 The Scheme The Scheme Comprises Community Enhancements At Tithe Farm Recreation Ground, Houghton Regis, Dunstable, Lu5 5jd Construction Of A Replacement Pavilion Together With All Associated External Works And Drainage. The Employer Is Houghton Regis Town Council. The Development Is Being Funded By A Combination Of Funds From Houghton Regis Town Council, Central Beds Council And The Football Foundation. The Employer's Objective Is To Agree A Fixed Price Contract For The Design And Construction Of The Works As Defined Within The Tender Documents Utilising Two Stage Tendering Procedures In Competition And The Jct Design And Build Contract 2016. The Tender Documents Comprise The Following: A) Preliminaries B) Architect's Drawings C) Mechanical & Electrical Strategy & Energy Strategy D) Structural Strategy Drawings E) Key Programme Dates F) Jpp Site Investigation Report G) Cost Plan H) Additional Surveys Available Upon Request Including: • Bat Surveys • Arboricultural Surveys • Habitat/ecology Surveys • Jpp Site Investigation Report Information Is Also Available On The Planning Portal. With The Exception Of The Items Listed In 1.9 Below The Contractor's Stage 1 Tender Is To Be Totally Inclusive Of The Following: A) Professional Fees And Expenses In Connection With Scheme Design, Detail Design, Production Information And Site Supervision Of The Works Including The Provision Of Full Collateral Warranties To The Employer. B) Building Regulation Fees. C) Preliminaries For Replacement Pavilion Including All Associated External Works And Drainage. D) On And Off-site Overheads Including A Full Site Management Team With A Site Foreman On Site At All Times. E) Stage 1 Contract Sum Based On Cost Plan Included In Tender Documents. F) All Provisional Sums Included Within The Contract Sum Analysis G) Principal Designer Services (under Cdm Regulations 2015). H) Any Other Costs Not Included Above Required For Full Design And Construction Of The Works As Part Of Their Tender Return, The Contractor Is To Return The Following Items:- 1) The Completed 'form Of Tender' And 'contract Sum Analysis' Including Detailed Breakdown Of Preliminaries Costs. 2) Proposed Design Team Including Architect, Structural And Civil Engineers. Mechanical And Electrical Engineers. Any Other Consultants That Will Form Part Of The Contractor Offer. 3) Details Of Insurances 4) Details Of Quality Assurance Systems 5) Curriculum Vitae And Relevant Comparative Project Experience In The Last Three Years For Project Manager, Site Manager, Contract Surveyor, Design Coordinator & Design Team. 6) Detailed Contract Program Highlighting Design And Construction Phases Tenders To Be Submitted To The Town Clerk By Email Only Clare.evans@houghtonregis.org.uk

Closing Date

12 Nov 2021

Tender Amount

EUR 800 K (USD 876.4 K)
United Kingdom
Welcome Back Fund Future Proofing The Town Centre - Action Plan Background In April 2021 Central Bedfordshire Council Wrote To Town Council's Offering Them The Opportunity To Access The Central Government Welcome Back Fund. The Purpose Of The Fund Was Help Local Authorities Encourage Shoppers And Employees To Return To Town Centres In A Safe Way, And To Ensure That Economic Activity Returns As Quickly As Possible. Supporting Documents To Be Made Available To Successful Consultant • Cbc Letter Dated 26th April 2021 • Hrtc Funding Application • Town Centre Visitor Survey Dated 2019 Funding Restrictions • The Total Funding Available To Hrtc Is £15,000 • The Funding Deadline For Spend Is 31st March 2022 Brief Re: Future Proofing The Town Centre - Action Plan In Accordance With The Hrtc Funding Application Hrtc Are Looking To Develop An Action Plan To Future Proof The Town Centre (reflecting On Outcomes Of The Town Centre Survey Completed In 2019) To Encourage Safe Access Into The Town Centre Focusing On Sustainable Transport Options Specifically Walking And Cycling. The Action Plan Is To Identify Opportunities, Levers, Blockages / Constraints And To Develop Short, Medium And Long Term Actions. The Action Plan Should Include: 1. Overarching Strategic Statement 2. 10 Guiding Principles 3. Action Points Additional Actions (outside Of This Brief) Additional Actions To Be Followed Up On Should Wbf Funding Allow Include: • Installation / Refresh Of Signage And Floor Markings To Encourage Footfall Into The Town Centre From Local Residential Areas And Local Facilities; • Modernisation Of Cycle Parking Provision In The Town Centre To Provide An Attractive And Fit For Purpose Facility. • A Publicity Campaign Focused On Visitor's Role In Ensuring That The Local Economy Can Reopen Safely Safe Whilst Promoting Sustainable Transport Into The Town Centre To Boost Footfall And Encourage People Back Into The High Streets It Is Anticipated That These Actions Will Be Included With The Action Plan. Delivery Up To A Half Day Workshop (in Person) With Staff And Members Looking At: • Opportunities - What Is Good In The Town Centre, What Draws People In; • Levers - What Has The Town Centre And The Immediate Surrounding Area Got Which We Can Use To Lever Visitors Not The Centre • Blockages & Constraints - What Will / Does Stop Us Maximising On The Opportunities And Using The Levers • What Could Our Short, Medium And Long Term Actions Be. Preparation Of A Draft Action Plan To Be Shared With The Town Clerk And The Wbf Working Group Members And Feedback Invited (teams) Finalisation Of The Action Plan And Presentation To The Council (teams) Application Process Please Submit Your Proposal By Email To Clare.evans@houghtonregis.org.uk

Closing Date

17 Dec 2021

Tender Amount

EUR 8 K (USD 8.7 K)
United Kingdom
Community Enhancements / Improvements, Tithe Farm Recreation Ground

Closing Date

25 Oct 2021

Tender Amount

Refer Documents 
United Kingdom
Changing Room Refurbishment Changing Rooms A & B Isolate Existing Services, Strip Out To Carefully Remove Any Existing Loose Or Damaged Wall Tiles Make Good Plaster Work Supply & Fit Whiterock, Up To 2400mm High, Stuck To Existing Walls With Welded Joints. Jointing Between Altro & Whiterock To Uplift Existing Flooring & Make Good Supply Lay Levelling Compound Supply & Fit New Safety Flooring Cap & Coved Throughout To Manufacture & Reinstate New Toilet Cubicles In Compact Grade Laminate 12.5mm, Edges Chamfered, Polished Ironmongery Durable Satin Anodised Aluminium To Supply, Install & Plumb In New Wall Hung Wash H& Basins Fitted With Push Top, Time Flow Taps Fitted With A Thermostatic Controller & Isolation Valves Mount & Plumb In New Standard Size Toilet Pans & Low Level Cisterns With Push Button (urinals In Male Area) Supply & Install New Showers Install New Drinking Fountain, Soap & H& Towel Dispensers Supply & Fit New 'bar' Style Wall Heaters Supply Back To Boiler Room Timer Including Frost Stat Decorate Using Vinyl Matt Paint All Remaining Walls & Exposed Pipe Work & Doors Make Good Any Damages & General Wear & Tear To All Walls Supply Only Perimeter Benches Using 'cantilever' Support Brackets In Metal, Powder Coated To Match. Seating Slats Manufactured From Polyrey Compact Solid Grade 'sanitized Antibacterial' Laminate 12.5mm. All Edges Machined, Chamfered & Polished Supply Only Perimeter Coat Hook Rails In Polyrey Compact Solid Grade 'sanitized Antibacterial' Laminate 12.5mm. All Edges Machined, Chamfered & Polished Supply Aluminium Coat Hoots Lobby Area Refurbishment To Uplift Existing Flooring & Make Good Supply Lay Levelling Compound Supply & Fit New Safety Flooring Cap & Coved Throughout To Decorate Using Vinyl Matt Paint All Remaining Walls & Exposed Pipe Work & Doors. To Make Good Any Damages & General Wear & Tear To All Walls Kitchen Area Refurbishment Remove Existing Cupboard Units. Supply &install New Base Units To Uplift Existing Flooring & Make Good Supply Lay Levelling Compound Supply & Fit New Safety Flooring Cap & Coved Throughout To Decorate Using Vinyl Matt Paint Throughout Remaining Walls & Exposed Pipe Work & Doors. To Make Good Any Damages & General Wear & Tear To All Walls New Proposed Wc Room / Area To Construct New Wc Area Within Left H& Changing Room Partition Part Of Changing Room Install 2 New Doorways & Doors Supply & Fit New Toilet Pan & Wash Hand & Basin Connect Into Local Drain To Uplift Existing Flooring & Make Good Supply Lay Levelling Compound Supply & Fit New Safety Flooring Cap & Coved Throughout To Decorate Using Vinyl Matt Paint Throughout Remaining Walls & Exposed Pipe Work & Doors. To Make Good Any Damages & General Wear & Tear To All Walls Supply & Install New Light To Be Received By Clare Evans By Email, Clare.evans@houghtonregis.org.uk

Closing Date

2 Feb 2021

Tender Amount

EUR 60 K (USD 65.7 K)
United Kingdom
Future Proofing The Town Centre - Action Plan

Closing Date

17 Dec 2021

Tender Amount

Refer Documents