Fabrication Tenders
Fabrication Tenders
Bharat Petroleum Corporation Limited - BPCL Tender
Civil And Construction...+3Consultancy Services, Pipe Line Project, Civil And Architectural Services
GEM
India
Closing Date8 Mar 2025
Tender AmountINR 825 K (USD 9.5 K)
Description: CATEGORY: Custom Bid for Services - Supply Fabrication Erection and
Commissioning of Additional Pipeline at BPCL Chennai AFS
Narmada Water Resources Water Supply And Kalpsar Department - NWRWS Tender
Civil And Construction...+1Irrigation Work
India
Closing Date27 Mar 2025
Tender AmountINR 3.3 Million (USD 38.5 K)
Description: Providing, Fabricating And Erecting Complete New Emergency And Service Gate Including Main And Guide Roller Assembly, Embeded Parts, Stem Rod, 8 Mt Screw Lift Type Hoist Mechanism, Hoist Platform, Spiral Ladder From Top Of Hoist Platform To Bottom Of H.r. Well, Approach Foot Bridge For Earthen Dam To H.r. Well And Other Misc. Work Etc Complete New Work Of Hiran-i Irrigation Scheme.
Sarva Haryana Gramin Bank Tender
Automobiles and Auto Parts
GEM
India
Closing Date12 Mar 2025
Tender AmountINR 2 Million (USD 23.1 K)
Description: CATEGORY: Repair, Maintenance, and Installation of Plant/
Systems/Equipments (Version 2) - fabrication of tata 407
vehicle into mobile van; Automobile, Vehicles; Service
Provider
Municipal Corporation Of Greater Mumbai - MCGM Tender
Civil And Construction...+1Civil Works Others
Eprocure
India
Closing Soon4 Mar 2025
Tender AmountINR 320 K (USD 3.7 K) This is an estimated amount, exact amount may vary.
Details: Fabrication, Supply and Installation of Protective safety grills for Cirsular Manhole cover on sewerline in Kurla (E) in L Ward beat No. 169.
Rajasthan State Mines And Minerals Limited - RSMML Tender
Scraps
MSTC
India
Closing Date18 Mar 2025
Tender AmountRefer Documents
Description: Auction Sale Of Lot No : 1 Lot Name : Scrap Aluminium Conductor Of Overhead Lines , Lot No : 2 Lot Name : Scrap Conveyor Belts Of Different Sizes And Conveyor Belt Strips , Lot No : 3 Lot Name : Scrap Hdpe/ Pvc Bags , Lot No : 4 Lot Name : Scrap Rubberised Spare Parts , Lot No : 5 Lot Name : Misc. Scrap Spare Parts Of M.s./ci/ Fabricated Etc. ,
Department Of Public Works And Highways - DPWH Tender
Civil And Construction...+2Others, Construction Material
Philippines
Closing Date18 Mar 2025
Tender AmountPHP 4.9 Million (USD 85.5 K)
Details: Description Part I Other General Requirements B.3(1) Permits And Clearances L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ B.5(1) Project Billboard / Signboard Each 2.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ B.7(1) Occupational Safety And Health L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ Total Cost (part I) Carried To Summary Php Part Ii Civil, Mechanical, Electrical And Sanitary / Plumbing Works Part A Earthworks 801(1) Removal Of Structures And Obstruction L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 803(1)a Structure Excavation (common Soil) Cu.m. 97.77 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 804(1)a Embankment From Roadway/structure Excavation (common Soil) Cu.m. 87.64 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 804(7) Gravel Fill Cu.m. 8.68 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ Total Cost (part A) Carried To Summary Php Part B Plain And Reinforced Concrete Works 900(1)i Structural Concrete (class A, 28 Days) Cu.m. 62.79 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 902(1)a1 Reinforcing Steel (deformed) (grade 40) Kg. 3,513.38 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 903(2) Formworks And Falseworks Sq.m. 255.49 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ Total Cost (part B) Carried To Summary Php Part C Finishings And Other Civil Works 1003(11)a1 Fascia Board (12mm., Fiber Cement Board) M. 95.48 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1032(1)a Painting Works (masonry/ Concrete) Sq.m. 154.94 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1032(1)c Painting Works (steel) Sq.m. 339.91 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1014(1)a2 Pre-painted Metal Sheets (above 0.427mm., Corrugated, Long Span) Sq.m. 565.24 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1013(2)a Fabricated Metal Roofing Accessory (gauge 26 (0.551 Mm.), Ridge/hip Rolls) L.m. 26.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1013(2)b Fabricated Metal Roofing Accessory (gauge 26 (0.551 Mm.), Flashing) L.m. 43.48 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1013(2)c Fabricated Metal Roofing Accessory (gauge 26 (0.551 Mm.), Gutters) L.m. 52.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1047(7) Structural Steel L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1047(8)a Structural Steel (trusses) Kg. 6,087.11 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1047(8)b Structural Steel (purlins) Kg. 6,046.26 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1047(5)a Metal Structure Accessories (bolts And Rods) Kg. 75.41 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1047(5)d Metal Structure Accessories (steel Plates) Kg. 415.66 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1047(5)b Metal Structure Accessories (sagrods) Kg. 231.61 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1047(5)c Metal Structure Accessories (cross Bracing) Kg. 390.17 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1047(4)b Metal Structure Accessories (turnbuckle) Each 24.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1001(9) Storm Drainage And Downspout L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1001(6) Catch Basin L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ Total Cost (part C) Carried To Summary Php Part D Electrical 1100(10) Conduits, Boxes & Fittings (conduit Works/ Conduit Rough-in) L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1101(33) Wires And Wiring Devices L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1102(1) Panelboard With Main & Branch Breakers L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ 1103(1) Lighting Fixtures L.s. 1.00 In Words: Pesos ______________________ In Figures: Php ____________________ In Words: Pesos ______________________ In Figures: Php ____________________ Total Cost (part D) Carried To Summary Php
BARANGAY NEW TANGLAG TABUK, KALINGA Tender
Civil And Construction...+3Civil Works Others, Building Construction, Construction Material
Philippines
Closing Soon5 Mar 2025
Tender AmountPHP 100 K (USD 1.7 K)
Description: Fabrication Of Basketball Facilities At New Tanglag, Tabuk City (kalinga) , Construction Materials And Supplies ,barangay New Tanglag - Tabuk, Kalinga
Paranaque National High School Tender
Civil And Construction...+2Others, Pipe Line Project
Philippines
Closing Soon3 Mar 2025
Tender AmountPHP 116.1 K (USD 2 K)
Details: Description Project Title: Installation Of Stainless Steel Handrails 1. General Overview This Project Involves The Supply, Fabrication, And Installation Of Stainless Steel Handrails At Designated Areas Of The Quisumbing Building. The Work Will Be Executed In Accordance With Project Specifications, Safety Standards, And Industry Best Practices. 2. Scope Of Work 2.1 Preparation & Site Inspection • Conduct A Site Inspection To Verify Dimensions And Confirm Installation Requirements. • Assess Structural Integrity Of The Mounting Surfaces (e.g., Walls, Stairs, Floors) To Ensure Proper Support For Handrails. • Secure Necessary Permits And Approvals As Required. 2.2 Supply & Fabrication • Procure High-quality Grade 304/316 Stainless Steel Materials For Durability And Corrosion Resistance. • Fabricate Stainless Steel Handrails To Specified Dimensions, Ensuring Compliance With Design Plans. • Polish And Finish Handrails To Meet Aesthetic And Safety Standards. 2.3 Installation • Mark And Prepare Mounting Locations Based On Approved Design Plans. • Install Stainless Steel Posts, Brackets, And Supports Using Appropriate Fasteners And Anchors. • Secure Handrails Onto The Posts, Ensuring Proper Alignment, Height, And Stability. • Weld Or Bolt Connections As Necessary And Polish Weld Joints For A Seamless Finish. • Verify Proper Spacing And Compliance With Building Codes And Safety Regulations. 2.4 Quality Control & Finishing • Inspect All Installed Components For Stability, Alignment, And Quality Of Finish. • Clean And Polish Stainless Steel Surfaces To Remove Any Debris Or Marks. • Conduct Load Testing If Required To Ensure Durability And Safety. 2.5 Handover & Documentation • Conduct A Final Walkthrough With The Client For Approval. • Provide Maintenance Guidelines And Care Instructions For Stainless Steel Handrails. • Submit As-built Drawings And Project Completion Reports. 3. Materials & Equipment • Stainless Steel Pipes, Tubes, And Fittings • Anchors, Bolts, And Fasteners • Welding Tools And Polishing Equipment • Measuring Tools And Safety Gear 4. Safety & Compliance • Adhere To Osha Standards And Local Building Codes For Handrail Installation. • Ensure Workers Use Proper Ppe (helmets, Gloves, Safety Harnesses). • Implement Site Safety Measures, Including Barricades And Warning Signs. 5. Exclusions • Civil Works, Such As Repairing Damaged Mounting Surfaces. • Electrical Or Lighting Modifications Related To The Handrails. • Additional Work Outside The Agreed Scope Without Prior Approval.
National Irrigation Administration Tender
Civil And Construction...+1Construction Material
Philippines
Closing Soon3 Mar 2025
Tender AmountPHP 86.5 K (USD 1.4 K)
Description: Fabrication Of Cabinet (2025-02-0019) , Construction Projects ,national Irrigation Administration -cauayan City Isabela
161-170 of 1719 active Tenders