Bureau Of Fisheries And Aquatic Resources Tender
Bureau Of Fisheries And Aquatic Resources Tender
Costs
Summary
Rehabilitation Of Sewage Pipeline And Septic Tank , Construction Projects ,bureau Of Fisheries And Aquatic Resources
Description
Description No. "item Description (item Name & Technical Specifications)" Qty. Unit Approved Budget For The Contract (abc) 1 Rehabilitation Of Sewage Pipeline And Septic Tank Rehabilitation Of Sewage Pipeline And Septic Tank Rehabilitation Of Sewage Pipeline And Septic Tank 1 A. Mobilization/demobilization A. Mobilization/demobilization A. Mobilization/demobilization 1 Lot 8,925.00 B. Removal Of Existing Drainage Lines, 4"ø And Repair Of Damaged Pavements B. Removal Of Existing Drainage Lines, 4"ø And Repair Of Damaged Pavements B. Removal Of Existing Drainage Lines, 4"ø And Repair Of Damaged Pavements 1 Lot 4,483.50 C. Removal And Reinstallation Of Water Closet, Including Repair Of Clogged Pipes C. Removal And Reinstallation Of Water Closet, Including Repair Of Clogged Pipes C. Removal And Reinstallation Of Water Closet, Including Repair Of Clogged Pipes 1 Lot 960.75 D. Removal Of Existing 2"ø And 1"ø G.i. Pipe (water Supply), Including All Necessary Works D. Removal Of Existing 2"ø And 1"ø G.i. Pipe (water Supply), Including All Necessary Works D. Removal Of Existing 2"ø And 1"ø G.i. Pipe (water Supply), Including All Necessary Works 1 Lot 2,882.25 E. Dewatering (excavation Of Septic Tank) E. Dewatering (excavation Of Septic Tank) E. Dewatering (excavation Of Septic Tank) 1 Lot 3,675.00 F. Supply And Installation Of Septic Tank With Sump Pit F. Supply And Installation Of Septic Tank With Sump Pit F. Supply And Installation Of Septic Tank With Sump Pit Siteworks Siteworks Siteworks Excavation Excavation Excavation 43.94 Cu.m 31,464.56 Backfill And Compaction Backfill And Compaction Backfill And Compaction 3.2 Cu.m 1,229.76 Gravel Bedding, 50mm Thk Gravel Bedding, 50mm Thk Gravel Bedding, 50mm Thk 0.8 Cu.m 2,295.55 Hauling And Disposal Hauling And Disposal Hauling And Disposal 1 Lot 9,607.50 Concrete Works, 21mpa (footing, Column, Beam And Slab) Concrete Works, 21mpa (footing, Column, Beam And Slab) Concrete Works, 21mpa (footing, Column, Beam And Slab) Cement, 40kg Cement, 40kg Cement, 40kg 83 Bag 39,445.75 Sand, Washed Sand, Washed Sand, Washed 4.6 Cu.m 11,260.75 Crushed Gravel, 3/4" Crushed Gravel, 3/4" Crushed Gravel, 3/4" 9.2 Cu.m 23,098.99 Reinforcing Steel Bars (including Tiewire) Reinforcing Steel Bars (including Tiewire) Reinforcing Steel Bars (including Tiewire) 10mmø X 6.0m Def Bar, 10mmø X 6.0m Def Bar, Grade 40 10mmø X 6.0m Def Bar, Grade 40 47 Piece 16,857.96 12mmø X 6.0m Def Bar, 12mmø X 6.0m Def Bar, Grade 40 12mmø X 6.0m Def Bar, Grade 40 99 Piece 42,256.17 16mmø X 6.0m Def Bar, 16mmø X 6.0m Def Bar, Grade 40 16mmø X 6.0m Def Bar, Grade 40 19 Piece 14,174.95 G.a. #16 G.i. Tiewire G.a. #16 G.i. Tiewire G.a. #16 G.i. Tiewire 12 Kg 2,152.08 Formworks And Scaffolding Formworks And Scaffolding Formworks And Scaffolding Marine Plywood , 1/2" X 4' X 8' Marine Plywood , 1/2" X 4' X 8' Marine Plywood , 1/2" X 4' X 8' 17 Piece 22,865.85 Rough Lumber, 2" X 3" X 12' Rough Lumber, 2" X 3" X 12' Rough Lumber, 2" X 3" X 12' 105 Piece 54,232.50 Assorted Common Wire Assorted Common Wire Nails Assorted Common Wire Nails 19 Kg 2,725.93 Masonry Works (including Plastering) Masonry Works (including Plastering) Masonry Works (including Plastering) Chb, 6" Thk Chb, 6" Thk Chb, 6" Thk 445 Piece 19,953.80 Cement, 40kg Cement, 40kg Cement, 40kg 43 Bag 20,435.75 Sand Sand Sand 4 Cu.m 9,791.96 10mmø X 6.0m Def Bar, 10mmø X 6.0m Def Bar, Grade 40 10mmø X 6.0m Def Bar, Grade 40 27 Piece 9,684.36 G.a. #16 G.i. Tiewire G.a. #16 G.i. Tiewire G.a. #16 G.i. Tiewire 1.5 Kg 269.01 Waterproofing Works Waterproofing Works Waterproofing Works Cementitious Waterproofing (2 Coats), 4l/gal Cementitious Waterproofing (2 Coats), 4l/gal Cementitious Waterproofing (2 Coats), 4l/gal 26 Gallon 41,965.56 Consumables (roller, Brush, Etc.) Consumables (roller, Brush, Etc.) Consumables (roller, Brush, Etc.) 1 Lot 1,921.50 Plumbing Works Plumbing Works Plumbing Works Pvc Sanitary Tee, 4"ø Pvc Sanitary Tee, 4"ø Pvc Sanitary Tee, 4"ø 4 Piece 1,291.24 Pvc Clean Out, 4"ø Pvc Clean Out, 4"ø Pvc Clean Out, 4"ø 4 Piece 860.84 G. Supply And Installation Of Septic Tank G. Supply And Installation Of Septic Tank G. Supply And Installation Of Septic Tank Siteworks Siteworks Siteworks Excavation Excavation Excavation 27.5 Cu.m 19,692.20 Backfill And Compaction Backfill And Compaction Backfill And Compaction 2.1 Cu.m 807.03 Gravel Bedding, 50mm Thk Gravel Bedding, 50mm Thk Gravel Bedding, 50mm Thk 0.5 Cu.m 1,434.72 Hauling And Disposal Hauling And Disposal Hauling And Disposal 1 Lot 6,405.00 Concrete Works, 21mpa (footing, Column, Beam And Slab) Concrete Works, 21mpa (footing, Column, Beam And Slab) Concrete Works, 21mpa (footing, Column, Beam And Slab) Cement, 40kg Cement, 40kg Cement, 40kg 59 Bag 28,039.75 Sand, Washed Sand, Washed Sand, Washed 3.3 Cu.m 8,078.37 Crushed Gravel, 3/4" Crushed Gravel, 3/4" Crushed Gravel, 3/4" 6.6 Cu.m 16,571.02 Reinforcing Steel Bars (including Tiewire) Reinforcing Steel Bars (including Tiewire) Reinforcing Steel Bars (including Tiewire) 10mmø X 6.0m Def Bar, 10mmø X 6.0m Def Bar, Grade 40 10mmø X 6.0m Def Bar, Grade 40 39 Piece 13,988.52 12mmø X 6.0m Def Bar, 12mmø X 6.0m Def Bar, Grade 40 12mmø X 6.0m Def Bar, Grade 40 78 Piece 33,292.74 16mmø X 6.0m Def Bar, 16mmø X 6.0m Def Bar, Grade 40 16mmø X 6.0m Def Bar, Grade 40 16 Piece 11,936.80 G.a. #16 G.i. Tiewire G.a. #16 G.i. Tiewire G.a. #16 G.i. Tiewire 10 Kg 1,793.40 Formworks And Scaffolding Formworks And Scaffolding Formworks And Scaffolding Marine Plywood , 1/2" X 4' X 8' Marine Plywood , 1/2" X 4' X 8' Marine Plywood , 1/2" X 4' X 8' 13 Piece 17,485.65 Rough Lumber, 2" X 3" X 12' Rough Lumber, 2" X 3" X 12' Rough Lumber, 2" X 3" X 12' 82 Piece 42,353.00 Assorted Common Wire Assorted Common Wire Nails Assorted Common Wire Nails 15 Kg 2,152.05 Masonry Works (including Plastering) Masonry Works (including Plastering) Masonry Works (including Plastering) Chb, 6" Thk Chb, 6" Thk Chb, 6" Thk 278 Piece 12,465.52 Cement, 40kg Cement, 40kg Cement, 40kg 27 Bag 12,831.75 Sand Sand Sand 2.4 Cu.m 5,875.18 10mmø X 6.0m Def Bar, 10mmø X 6.0m Def Bar, Grade 40 10mmø X 6.0m Def Bar, Grade 40 17 Piece 6,097.56 G.a. #16 G.i. Tiewire G.a. #16 G.i. Tiewire G.a. #16 G.i. Tiewire 1 Kg 179.34 Waterproofing Works Waterproofing Works Waterproofing Works Cementitious Waterproofing (2 Coats), 4l/gal Cementitious Waterproofing (2 Coats), 4l/gal Cementitious Waterproofing (2 Coats), 4l/gal 17 Gallon 27,439.02 Consumables (roller, Brush, Etc.) Consumables (roller, Brush, Etc.) Consumables (roller, Brush, Etc.) 1 Lot 1,434.72 Plumbing Works Plumbing Works Plumbing Works Sanitary Tee, 4"ø Sanitary Tee, 4"ø Sanitary Tee, 4"ø 4 Piece 1,291.24 Pvc Clean Out, 4"ø Pvc Clean Out, 4"ø Pvc Clean Out, 4"ø 4 Piece 860.84 H. Supply And Installation Of Concrete Manhole (9 Sets) H. Supply And Installation Of Concrete Manhole (9 Sets) H. Supply And Installation Of Concrete Manhole (9 Sets) Siteworks Siteworks Siteworks Excavation Excavation Excavation 2.2 Cu.m 1,575.38 Gravel Bedding, 50mm Thk Gravel Bedding, 50mm Thk Gravel Bedding, 50mm Thk 0.2 Cu.m 573.89 Hauling And Disposal Hauling And Disposal Hauling And Disposal 1 Lot 1,921.50 Concrete Works, 21mpa Concrete Works, 21mpa Concrete Works, 21mpa Cement, 40kg Cement, 40kg Cement, 40kg 8 Bag 3,802.00 Sand, Washed Sand, Washed Sand, Washed 0.5 Cu.m 1,224.00 Crushed Gravel, 3/4" Crushed Gravel, 3/4" Crushed Gravel, 3/4" 1 Cu.m 2,510.76 12mmø X 6.0m Def Bar, Grade 40 12mmø X 6.0m Def Bar, Grade 40 12mmø X 6.0m Def Bar, Grade 40 7 Piece 2,987.81 G.a. #16 G.i. Tiewire G.a. #16 G.i. Tiewire G.a. #16 G.i. Tiewire 1 Lot 179.34 Masonry Works Masonry Works Masonry Works Chb, 4" Thk Chb, 4" Thk Chb, 4" Thk 95 Piece 3,577.70 Cement, 40kg Cement, 40kg Cement, 40kg 8 Bag 3,802.00 Sand Sand Sand 0.8 Cu.m 1,958.39 10mmø X 6.0m Def Bar, 10mmø X 6.0m Def Bar, Grade 40 10mmø X 6.0m Def Bar, Grade 40 7 Piece 2,510.76 G.a. #16 G.i. Tiewire G.a. #16 G.i. Tiewire G.a. #16 G.i. Tiewire 0.5 Kg 89.67 Fittings Fittings Fittings Cleanout, 4"ø Cleanout, 4"ø Cleanout, 4"ø 4 Piece 860.84 Wye, 4"ø Wye, 4"ø Wye, 4"ø 2 Piece 520.08 Double Wye, 4"ø Double Wye, 4"ø Double Wye, 4"ø 2 Piece 1,004.30 Elbow 90˚ X 4"ø Elbow 90˚ X 4"ø Elbow 90˚ X 4"ø 2 Piece 538.02 I. Supply And Installation Of New 4"ø Pvc Pipe (drainage Line) I. Supply And Installation Of New 4"ø Pvc Pipe (drainage Line) I. Supply And Installation Of New 4"ø Pvc Pipe (drainage Line) Pvc Pipe, 4"ø X 3m Pvc Pipe, 4"ø X 3m Pvc Pipe, 4"ø X 3m 28 Piece 55,236.72 J. Supply And Installation Of Stainless Submersible Sewage Pump (1 Hp), Including Tapping From Existing Electrical Lines J. Supply And Installation Of Stainless Submersible Sewage Pump (1 Hp), Including Tapping From Existing Electrical Lines J. Supply And Installation Of Stainless Submersible Sewage Pump (1 Hp), Including Tapping From Existing Electrical Lines 1 Set 29,591.10 K. Supply And Installation Of Controller Contactor Sensor Pump Tank (5 Meters), Including All Necessary Works K. Supply And Installation Of Controller Contactor Sensor Pump Tank (5 Meters), Including All Necessary Works K. Supply And Installation Of Controller Contactor Sensor Pump Tank (5 Meters), Including All Necessary Works 1 Set 1,883.07 L. Supply And Installation Of 2"ø Ppr Pipe, Including Fittings, 2"ø Gate Valve And Tapping To Existing Elevated Water Tank L. Supply And Installation Of 2"ø Ppr Pipe, Including Fittings, 2"ø Gate Valve And Tapping To Existing Elevated Water Tank L. Supply And Installation Of 2"ø Ppr Pipe, Including Fittings, 2"ø Gate Valve And Tapping To Existing Elevated Water Tank Ppr Pipe, 2"ø X 4m, Pn10 (main) Ppr Pipe, 2"ø X 4m, Pn10 (main) Ppr Pipe, 2"ø X 4m, Pn10 (main) 17 Piece 44,207.31 Ppr Double Union Ball Valve, 2"ø Ppr Double Union Ball Valve, 2"ø Ppr Double Union Ball Valve, 2"ø 2 Set 3,048.78 Ppr Elbow, 2"ø Ppr Elbow, 2"ø Ppr Elbow, 2"ø 1 Piece 448.35 Ppr Female Adapter, 2"ø Ppr Female Adapter, 2"ø Ppr Female Adapter, 2"ø 1 Piece 2,600.43 M. Supply And Installation Of 1"ø Ppr Pipe, Including Fittings And Tapping Of Existing Lines To New Lines, Like Comfort Rooms, Etc. M. Supply And Installation Of 1"ø Ppr Pipe, Including Fittings And Tapping Of Existing Lines To New Lines, Like Comfort Rooms, Etc. M. Supply And Installation Of 1"ø Ppr Pipe, Including Fittings And Tapping Of Existing Lines To New Lines, Like Comfort Rooms, Etc. Ppr Pipe, 1"ø X 4m, Pn10 Ppr Pipe, 1"ø X 4m, Pn10 Ppr Pipe, 1"ø X 4m, Pn10 25 Piece 20,175.75 Ppr Reducer Bushing, 2"ø X 1"ø Ppr Reducer Bushing, 2"ø X 1"ø Ppr Reducer Bushing, 2"ø X 1"ø 2 Piece 304.88 Ppr Elbow, 1"ø X 90° Ppr Elbow, 1"ø X 90° Ppr Elbow, 1"ø X 90° 2 Piece 197.28 Please See The Attached Plan Total 860,604.35
Contact
Tender Id
b70b5140-b5a5-31f2-9ade-a1cf53c2252aTender No
10991034Tender Authority
Bureau Of Fisheries And Aquatic Resources ViewPurchaser Address
-Website
http://notices.ps-philgeps.gov.ph