Get Latest Tenders. NO Keyword Restriction.BUY 1 GET 1 YEAR FREE
Guaranteed Value-For-Money PlansAnytime, Anywhere. No hidden charges.BUY 1 GET 1 YEAR FREEJoin Now

Additional Conditions & Specifications 1. The work shall be carried out strictly in accordance with CPWD Specification 2005, Part-I (Internal) & 1994 Part-II (external), part-IV- Sub-stations and CPWD Civil 1996 ( Vol-I & II ) amended up to date and shall comply with provisions of Indian Electricity Rule 1956 and Indian Electricity Act 1910 amended up to date. 2. Specifications not covered in the General specifications of CPWD shall be governed by relevant IS specifications. In case ISI specifications are also not available than the decision of Engineer-In-Charge given in writing based on acceptable sound engineering Practice and local usage shall be binding on the contractor. 3. All material shall be one of the make mentioned in CPWD specifications and approved by Engineer – In – Charge. All materials shall confirms to IS specifications wherever these exits. 4. All material brought by the Contractor for use on work shall have to of be good quality. The same has to be got approved from the Engineer-in-Charge before using the same on the work. No claim for defective material brought by the contractor and not approved by the Engineer-in-Charge shall be entertained. 5. All T&P required for execution of work i/c mounting of fitting on poles, digging of trenches, handling of materials brought by contractor at his own cost and nothing extra shall be paid on this account. 6. The contractor will furnish necessary certificate /documents / test certificate in support of genuiness /conformity to ISS of materials /items used at site & payment receipts of Service tax as & when desired by the department. 7. The work shall be carried out according to approved drawing, however the department reserves right to change the lay-out as per requirements of site. 8. The contractor is bound to sign the entry /entries made by Engineer in charge or his representative in the site order book time to time. 9. Embedding of earth electrode shall be done in the presence of Engineer in charge or his authorized representative. Loop earthing shall be as per CPWD specifications. 10. Notwithstanding the schedule of quantities, all items of inter-related work considered necessary to make installation complete and operative deemed to be included and shall be provided by the contractor at no extra cost. 11. The Electrical works shall be executed in close co-ordination with the progress of Building/Civil work. This being essence of the contract, no claim for idle labour will be entertained. 12. Any damage caused to Building as a result of execution of Electrical work shall be responsibility of the Electrical contractor. The damage if so caused shall be made good by the contractor promptly at his own caused to the entire satisfactions of the Engineer in charge. 13. The dismantled materials if any received from the work should be duly accounted for and returned to concerned JE(Elect) In charge of work at his store free of cost. 14. The rates tendered shall be for complete item of works inclusive of all taxes, duties & lavies etc. and all charges for the item contingent to the work. 15. Third party quality Audit & testing of samples in the designated lab is mandatory as per circular no. D/S.E.(QC)/2006/1571. Dated 25.10.06.The rates should be quoted accordingly. 16. The contractor has to carry out excavation of trenches for cables & pipe laying in a fixed time frame in close coordination with civil contractor. It will be the responsibility of the contractor to carry out the excavation of trenches with in target period utilizing all possible resources. 17. The watch and ward of entire installation shall be sole responsibility of the contractor until these are tested and handed over to the department. 18. Contractor shall make his own arrangement for watch & ward and safety of his men and material and nothing extra shall be paid by the department on this account. Contractor shall also be responsible for the safe custody of material issued to him by th

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.