Military Engineer Services Tender
If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.
Military Engineer Services - MES Tender
Eprocure
Opening Date23 Nov 2024
Closing Date14 Dec 2024
Tender Amount₹ 48,00,000
Costs
EMD
₹ 96,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_685295_1Tender No
CWE/SW/TOKEN-19/2024-25Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Checking of electrical control panel, including the preventive maintenance of PLC based controller, Touchscreen display, checking of electrical component including replacement of defective material as per site requirement for ensuring proper operation
-
-
-
Checking & repair / replacing of defective bearing / pulley / motor.
-
-
-
Ensuring of alignment of all doors and quarterly rechecking of same ensuring of hoist functioning, safety brakes and repair / replacement of same if required
-
-
-
Rewinding / replacement of Heavy duty / tailor made imported motor installed upto height of 18 meter.
-
-
-
Rrepair of fabric part in case of any accidental damage.
-
-
-
Carryout test and adjust the auto brake system installed at special purpose motor if needed shall be replaced along with microswitch.
-
-
-
Inspection, repair / replacement of safety arresters installed at individual doors.
-
-
-
Checking of Belt and replacement od same if required.
-
-
-
Checking and maintaining of alignment of mullion.
-
-
-
Checking / replacing / repairing of electrical control cable / wire in the complete system
-
-
-
Preventive maintenance of complete system on monthly basis should be submitted
-
-
-
Any other maintenance / repair to ensure proper functioning of system at site shoiuld be properly mainteained in complaint register and the same should be signed by User.
-
-
-
The contractor shall visit site and inspect complete hanger door fabric hoistup vertical door product No 37155 size 60000mmX16000mm with automation system and control panel including all connected devices before quoting the bid. The contractor should replace / rectify all defective item in hanger door fabric hoist up vertical door with automation system and control panel in quoted rate . No claim will be accepted against replacement oof defective items of hanger door fabric hoistup vertical door with automation system and control panel complete during contract period.
-
-
-
Note :1. During the period, servicing and repairing will be done as and when required for which no additional charges will be payable to the agency.
-
-
-
2. The OEM shall depute its engineer’s once in month to inspect the automation systems as a measure of preventive maintenance.
-
-
-
3. The repair shall be carried out at the location where the automation system is installed. If required,the contractor will be at liberty to remove the system and handover it to the OEM for further checking and repairs.
-
-
-
4. The decision for the replacement of any part or component of automation system is solely on OEM and the user discretion. Any parts or component of automation system that needs to be replaced/repair will not be charged separately, the same is included in the AMC
-
-
-
5. Any parts or component of automation system provided by THE Contractor for replacement,OEM shall be responsible / liable for the functioning of the automation systems.
-
-
-
6. The contractor undertakes to maintain all the automations in a proper condition, so as not to affect the working of the automation system. The maintenance and the smooth operation of all the automation system will be contractors responsibility, and shall be in the scope of OEM.
-
-
-
7. The contractor personnel will take utmost care while doing servicing/repairing of the automation but in case any untoward incident occurs leading to the damage of property and/or injuries to the personnel at the site, The contracor shall be responsible for the same.
-
-
-
8. The contracor hereby confirm that they shall respond to the give top priority and fast response within 02 hours towards the complaint for Fabric hoist up door under AMC contract.
-
-
-
9. All arrangements required for height works / man lift / hydra required for maintenance works shall be made byContractor.
-
-
-
10. Arrangements for all required spares for maintenance purpose shall be provided by Contractor.
-
-
-
11. If the automation system are renderedin-operational because damage due to mishandling , tempering acacident, negligenceby the department/staff of theuserdepartment or fire, earthquakke , floods or otheracts of nature the contractor reserves the rightto charge for repairs thereof.
-
-
-
12. The department/user departementshall ensureto maintain the automation systemin a propercondition so as not to affect the working of theautomation system. Operation of all theautomation system will be department/user departmentresponsibilityand shall not bein the scope of the agency.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%