Military Engineer Services Tender
If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.
Costs
EMD
₹ 98,380Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_662668_1Bid Award Id
ViewTender No
GE/DE-41/2024-25Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
REPAIR AND POLISHING TO WOODEN FURNITURE FOR OTM AND MD ACCN UNDER GE (EAST) DELHI CANTT-10
BOQ Items
Material and labour for in replacement of leg of table of required size made of well seasoned 1st class teak wood,, complete, all as specified and shown in drawing and as directed .
10
-
-
Material and labour for in replacement of front rail of required size made of well seasoned 1st class teak wood,, complete, all as specified and shown in drawing and as directed .
8
-
-
Material and labour for in replacement of side rail of required size made of well seasoned 1st class teak wood, complete, all as specified and shown in drawing and as directed .
8
-
-
Material and labour for in replacement of drawer with knob of required size made of well seasoned 1st class teak wood, complete all as specified and shown in drawing and as directed .
6
-
-
Material and labour for in replacement of stiffener of required size made of well seasoned 1st class teak wood, complete all as specified and shown in drawing and as directed .
4
-
-
Material and labour for preparation of old / new wooden surfaces of any description by scrapping, rubbed down by emery paper including filled up the cracks and pores with a paste and putty and applying two coats of French polish of approved quality with high gloss finish complete all as specified and directed.
8
-
-
REPAIR TO TABLE OFFICE CLERK WOODEN (DB-4120) :-
-
-
-
Top 16 mm thick plywood BWP grade ISI marked (Make-Century ply"'Sainik 710/Greenply" Green gold"/Archidply" Platinum"/Duroply"titanium") with 0.8/1 mm thick laminate(Make- Archidply/greenply/century) in colour/shade as approved by EIC/GE and balancing white sunmica 0.8/1 mm thick with 2/1.6 mm thick PVC edging of Make-Rehau/Pegasus/Kynex shall be fixed with strong bonded chemical adhesive through hot pressed machine complete rest all as per drg.
5
-
-
Material and labour for in replacement of leg of table of required size made of well seasoned 1st class teak wood,, complete, all as specified and shown in drawing and as directed .
3
-
-
Material and labour for in replacement of front rail of required size made of well seasoned 1st class teak wood,, complete, all as specified and shown in drawing and as directed .
4
-
-
Material and labour for in replacement of side rail of required size made of well seasoned 1st class teak wood, complete, all as specified and shown in drawing and as directed .
3
-
-
Material and labour for in replacement of drawer with knob of required size made of well seasoned 1st class teak wood, complete all as specified and shown in drawing and as directed .
3
-
-
Material and labour for in replacement of stiffener of required size made of well seasoned 1st class teak wood, complete all as specified and shown in drawing and as directed .
3
-
-
Material and labour for preparation of old / new wooden surfaces of any description by scrapping, rubbed down by emery paper including filled up the cracks and pores with a paste and putty and applying two coats of French polish of approved quality with high gloss finish complete all as specified and directed.
5
-
-
REPAIRS TO TRESTLE STORE ROOM WOODEN (FD - 86)
-
-
-
Material and labour in replacement for repair to trestle store room wooden by taking down the existing broken / unserviceable long rail and supply and fixing of new well seasoned second class hard wood Shisham long rail of size 2440mm x100mm x100mm all as per drawing and as specified and directed by the Engineer-in-Charge
72
-
-
Material and labour in replacement for repair to trestle store room wooden by taking down the existing broken / unserviceable leg and supply and fixing of new well seasoned second class hard wood Shisham leg of size 405mm x100mm x100mm all as per drawing and as specified and directed by the Engineer-in-Charge
78
-
-
Material and labour in replacement for repair to trestle store room wooden by taking down the existing broken / unserviceable stiffener and supply and fixing of new well seasoned second class hard wood stiffener of size 1980mm x175mm x100mm all as per drawing and as specified and directed by the Engineer-in-Charge
74
-
-
Material and labour for preparation of old / new wooden surfaces of any description by scrapping, rubbed down by emery paper including filled up the cracks and pores with a paste and putty and applying two coats of Paint as approved shade complete all as specified and as directed.
40
-
-
REPAIRS TO TRESTLE STORE ROOM STEEL (FD - 1043)
-
-
-
Material and labour in replacement for angle iron for long rail of size 2440mml long x50mm (Width) x 6 mm thick, including necessary cuttings, made to shape, welding etc. complete all as specified and shown in drawing and directed by the Engineer-in-Charge.
45
-
-
Material and labour in replacement for angle iron for leg of size 300mml long x50mm (Width) x 6 mm thick, including necessary cuttings, made to shape, welding etc. complete all as specified and shown in drawing and directed by the Engineer-in-Charge.
50
-
-
Material and labour in replacement for angle iron for stiffener of size 50mm x50mm (Width) x 6 mm thick, including necessary cuttings, made to shape, welding etc. complete all as specified and shown in drawing and directed by the Engineer-in-Charge.
40
-
-
Material and labour for preparation of old / new painted steel surfaces (external and internal) from Table dining and applying two coat of synthetic enamel paint by spray painting including preparation of surfaces complete all as specified and directed by the Engineer-in-Charge.
34
-
-
REPAIRS TO RACK STEEL SIX TIERS :-
-
-
-
Material and labour in replacement for angle iron of size 40mm x40mm x 4 mm thick, including necessary cuttings, made to shape, welding etc. complete all as specified and shown in drawing and directed by the Engineer-in-Charge.
50
-
-
Material and labour in replacement for shelf of rack steel made of 1 mm thick mild steel black sheet including necessary cuttings, made to shape, welding etc. complete all as specified and shown in drawing and directed by the Engineer-in-Charge.
42
-
-
Material and labour in replacement for back cover of rack steel made of 1 mm thick mild steel black sheet including necessary cuttings, made to shape, welding etc. complete all as specified and shown in drawing and directed by the Engineer-in-Charge.
28
-
-
Material and labour in replacement for side cover of rack steel made of 1 mm thick mild steel black sheet including necessary cuttings, made to shape, welding etc. complete all as specified and shown in drawing and directed by the Engineer-in-Charge.
34
-
-
Material and labour for preparation of old / new painted steel surfaces (external and internal) and applying two coat of synthetic enamel paint by spray painting including preparation of surfaces and filling cavities with putty wherever required complete all as specified and directed by the Engineer-in-Charge.
30
-
-
REPAIRS TO RACK RECORD / STORES OF SIZE 6 FEET X 2FEET X 6 FEET HIGHT :-
-
-
-
Material and labour in replacement for repair to Rack Record / Stores by taking down the existing broken / unserviceable leg and supply and fixing of new leg well seasoned Hard wood Shisham of size 4 inch x 4 inch & 6 feet long all as per drawing and as specified and directed by the Engineer-in-Charge
50
-
-
Material and labour in replacement for repair to Rack Record / Stores wooden by taking down the existing broken / unserviceable shelf and supply and fixing of new shelf well seasoned teak wood of size 900mm x600mm x 25mm all as per drawing and as specified and directed by the Engineer-in-Charge
64
-
-
Material and labour for fixing of 40mm x 6 mm thick MS clamp L- clamps into shelf to legs as directed by the Engineer-in-Charge
95
-
-
Material and labour for preparation of old / new painted wooden surfaces (external and internal) and applying two coat of synthetic enamel paint as per approved color by spray painting including preparation of surfaces and filling cavities with putty wherever required complete all as specified and directed by the Engineer-in-Charge.
26
-
-
Material and labour in replacement for standard quality cover of sofa cushion, size of cushion shall be 530 mm x 500mmx100mm thick, colour, shade and brand of cloths shall be approved by EIC/GE (Cost of cloth shall not be less than Rs 400/- per metre) complete with stiching and chain as per sample held with furniture yard
1200
-
-
Material and labour for dry cleaning for cloathing, textiles and upholestry using a chemical solvent other than water after preparation of surface including repair and stiching to the following furniture items all over complete and as directed by Engr-in-charge.
-
-
-
Sofa 3 seater with cushion
6
-
-
Sofa 5 seater with cushion
135
-
-
Sofa 4 seater with cushion
45
-
-
Chair dining with cushioned
750
-
-
Chair writing with cushioned
250
-
-
Chair computer revolving
170
-
-
Chair visitor all types
145
-
-
Table Dining 4' x 3' for JCOs/ORS: FD/MAP-II/03 or similar type Drg
-
-
-
Top 16 mm thick plywood BWP grade ISI marked (Make-Century ply"'Sainik 710/Greenply" Green gold"/Archidply" Platinum"/Duraply titanium) with 0.8/1 mm thick laminate(Make- Archidply/greenply/century) in colour/shade as approved by EIC/GE and balancing white sunmica 0.8/1 mm thick with 2/1.6 mm thick PVC edging of Make-Rehau/Pegasus/Kynex shall be fixed with strong bonded chemical adhesive through hot pressed machine complete rest all as per drg.
200
-
-
Teak wood corner shall be provided to each legs as per sample rest all as directed by EIC/GE.
800
-
-
Top long rail as per drg
100
-
-
Top short rail as per drg
80
-
-
Legs as per drg
60
-
-
shoe as per sample
800
-
-
Peg Table :FD-277/ 384, DB-3973
-
-
-
Top 16 mm thick plywood BWP grade ISI marked (Make-Century ply"'Sainik 710/Greenply" Green gold"/Archidply" Platinum"/Duraply titanium) with 0.8/1 mm thick laminate(Make- Archidply/greenply/century) in colour/shade as approved by EIC/GE and balancing white sunmica 0.8/1 mm thick with 2/1.6 mm thick PVC edging of Make-Rehau/Pegasus/Kynex shall be fixed with strong bonded chemical adhesive through hot pressed machine complete rest all as per drg.
940
-
-
Legs as per drg
400
-
-
Top Short shall be provided as per shape & size of long rail complete as directed by EIC
280
-
-
Center stiffener shall be provided as per shape & size of sides stiffner as directed by EIC.
200
-
-
Teak wood corner shall be provided to each legs as per sample rest all as directed by EIC/GE.
1800
-
-
shoe as per sample
2800
-
-
Teapoy : FD-278, 34, 382
-
-
-
Top 16 mm thick plywood BWP grade ISI marked (Make-Century ply"'Sainik 710/Greenply" Green gold"/Archidply" Platinum"/Duraply titanium) with 0.8/1 mm thick laminate(Make- Archidply/greenply/century) in colour/shade as approved by EIC/GE and balancing white sunmica 0.8/1 mm thick with 2/1.6 mm thick PVC edging of Make-Rehau/Pegasus/Kynex shall be fixed with strong bonded chemical adhesive through hot pressed machine complete rest all as per drg.
450
-
-
Center Stiffener as per bottom rail shape irrespective of what is shown on drg complete as directed by EIC
310
-
-
Legs as per drg
250
-
-
Teak wood corners to be provided all as directed by EIC/GE.
650
-
-
shoe as per sample
900
-
-
Bed Ply top :FD-246/247
-
-
-
Teak face ply 3.5 mm thick on head rest/foot rest (Make- Greenply/Century Ply/Archid Ply), with half round Tw beading complete as per drg
200
-
-
long rail as per drg
160
-
-
Ply top 12 mm thick BWP Grade (Make-Century ply"'Sainik 710/Greenply" Green gold"/Archidply" Platinum"/Duroply "titanium')rest all as per drg.
1200
-
-
Head rest complete as per drg
190
-
-
Foot rest complete as per drg
200
-
-
Stiffner as per drg
490
-
-
MS FI corner shall be provided to each legs as per sample & as directed by EIC/GE.
4800
-
-
Table writing: FD-33,275, DB-3982 or similar type
-
-
-
Top 16 mm thick plywood BWP grade ISI marked (Make-Century ply"'Sainik 710/Greenply" Green gold"/Archidply" Platinum"/Duraply titanium) with 0.8/1 mm thick laminate(Make- Archidply/greenply/century) in colour/shade as approved by EIC/GE and balancing white sunmica 0.8/1 mm thick with 2/1.6 mm thick PVC edging of Make-Rehau/Pegasus/Kynex shall be fixed with strong bonded chemical adhesive through hot pressed machine complete rest all as per drg.
400
-
-
Teak wood corner shall be provided to each legs as per sample rest all as directed by EIC/GE.
200
-
-
Legs as per drg
180
-
-
Stiffener side as per drg
200
-
-
complete cabinet body except drawer /shutter with 16 mm thick plywood BWP grade with 1/0.8 mm thick sumica and balancing white sunmica 1/0.8 mm thick, shade as approved by EIC/GE all as per drg and specified.
180
-
-
Back ply BWP grade as per drg.
200
-
-
Drawer made of 16 mm thick plywood BWP grade with bothside sumica 0.8/1 mm thick with 1.6 mm thick PVC edging through edge bander machine of shade as approved by EIC/GE with 2 mm thick PVC edging in front & sides and bottom of drawer shall be 9 mm thick BWP Plywood with white sunmica 0.8 mm thick (Make-Century ply/Greenply/Archidply) complete with telescopic channel (make -Ebco/Ozone/Hettich) complete . Rest all as per drg.
150
-
-
S/S handle as per sample
300
-
-
16 mm thick BWP grade plywood with bothside laminate sheet 0.8 mm thick of shade as approved by EIC/GE for Cabinet door along with magnetic catcher (make-Harrison/ebco) complete rest all as per drg and as directed by EIC.
280
-
-
Table 3'X2' with / without Drawer: FD-55/284/283/291/288 or simillar
-
-
-
Top 16 mm thick plywood BWP grade ISI marked (Make-Century ply"'Sainik 710/Greenply" Green gold"/Archidply" Platinum"/Duraply titanium) with 0.8/1 mm thick laminate(Make- Archidply/greenply/century) in colour/shade as approved by EIC/GE and balancing white sunmica 0.8/1 mm thick with 2/1.6 mm thick PVC edging of Make-Rehau/Pegasus/Kynex shall be fixed with strong bonded chemical adhesive through hot pressed machine complete rest all as per drg.
400
-
-
Legs as per drg
180
-
-
Top long rail as per drg
170
-
-
Top Short rail as per drg
170
-
-
Center Stiffener as directed by EIC
150
-
-
Short stiffener as per drg
180
-
-
Drawer made of 16 mm thick BWP plywood (make-as mentioned in 2(a) with 0.8/1 mm thick laminate sheet both side , shade as approved by EIC/GE with 2/1.6 mm thick PVC edging in front & sides and bottom of drawer shall be 9 mm thick BWP Plywood (Make-Century ply/Greenply/Archidply) complete with 0.8 /1 mm thick white sunmica and with telescopic channel (make -Ebco/Ozone/Hettich) complete . Rest all as per drg.
85
-
-
S/S handle as per sample held in yard.
70
-
-
Teak wood corner shall be provided to each legs as per sample rest all as directed by EIC/GE.
800
-
-
shoe as per sample
800
-
-
CHAIR REVOLVING LOW HIGH BACK (FD -TP)
-
-
-
Replacement of old unserviceable seat and back of chair revolving S&F new seat & back of chair and same size and shape. Seat and back fixed on frame with screw and including all minor repairs with welding to steel frame etc complete all as specified and as directed by Engineer-in-Charge. (Note :- The tapestry cloth of rate ranging between Rs. 150/- to Rs. 175/- per meter and as per sample approved by GE.)
120
-
-
Removing of old unserviceable tapestry cloth from seat and back of existing Chair and S&F new tapestry cloth to seat and back of Chair revolving all as specified and as directed by Engineer-in-Charge. (Note:- The tapestry cloth of rate ranging between Rs. 150/- to Rs. 175/- per meter as per sample approved by GE).
110
-
-
Replacement of old unserviceable arm rest with new arm rest of black integral skin polyurethane reinforced with MS insert and shall be scratch and weather resistant of Chair briefing static base all as directed.
200
-
-
Replacement of unserviceable hydrulic system of chair revolving for the adjustment of height completed all as directed by the Engineer-in-Charge.
200
-
-
All as per srl No 9 .04 here in before but wheel base of chair revolving.
120
-
-
All as per srl No 9.04 here in before but twin coaster wheel from chair revolving.
600
-
-
Replacement of cushion for seat & Back of sofa set
-
-
-
Material and labour in replacement for cushion for seat & Back of sofa set, cushion shall be 22" x 21" x 100mm thick PU foam with 40 density (Make-Sleepwell (Model-Primo cool) / Kurlon (Model-Gold line or Gold line plus ) coverd with best quailty tapestry . Sample of tapestry cloth kept in BSO Yard, colour, shade and brand of cloths shall be approved by EIC/GE (Cost of cloth shall not be less than Rs 400/- per metre) complete with stiching and chain as per sample held with furniture yard
980
-
-
Notes for BoQ:-(a) The furniture article as and when received from Unit/Occupant as case may be, the Engineer-in-Charge (BSO) shall enter these furniture articles in furniture deposit register (IAFW-1830) and shall subsequently issue for necessary repair/polishing to the Contractor through Nominal issue voucher(NIV) mentioning the date of issue duly signed by the contractor. In certain cases the repairable furniture article can also be issued directly from units. (b) The contractor shall return these furniture articles after repair work on or before 30 days from the date of issue of furniture and nominal Receipt Vouchers (NRV) shall be issued duly signed by furniture I/C, BSO and Contractor. (c) If the contractor fails to repair and return these furniture article within 30 days, a penalty of Rs 10 per furniture article per day will be levied to contractor and the same will be recovered from contractors claims. (d) Generally the periodicity for issue of furniture from BSO Yard shall be once or twice in a month (reckoning from date of commencement of work as per WO No.1) subjected to the users requirement/availability of furniture for repair works. However care shall be taken that repairable furniture shall be issued not more than 20% of total qty of CA provision in one month. (e) Removal of Existing componants of following MES Pattern Furniture Item's Carefully without disturbing the adjoining Parts and S&F new componants of same pattern as per Drg in lieu of Dismantled /Discorded componants including Tighting the Joints, Pinning, Screwing, wedging, Gluing, Providing Hinges, Placing every part in-tact condition. (g) Cleaning, Derusting of Stain/Dirt old polish with Grinder machine or Sand Paper as required and as directed making the Surface smooth filling the holes with putty where ever required and Applying two coats of French Polish for wooden Items. (h) Replaced/ Changed parts should be First finished seperately upto the level /extent so that the Painting /Polishing on whole Items should be matched and desired finish shall be obtained.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements