Archaeological Survey Of India Tender
... More
If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.
Archaeological Survey Of India - ASI Tender
Civil And Construction
Eprocure
Opening Date12 Aug 2022
Closing Date22 Aug 2022
Tender Amount₹ 44,64,066
Costs
EMD
₹ 89,281Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_ASI_706487_1Bid Award Id
ViewTender No
F.No.13/95/2022-WTender Authority
Archaeological Survey Of India ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 15.2.1 Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
32.79
65812
2007.1
... More
Providing and laying lime concrete on terrace with 50% lime mortar 1:1:1 (1 lime :1 shurkhi :1 sand) and mix with 10mm thick brick aggregade and mixing with adhesive material with beating, leveling, finishing of surface including carriage of material and water with in lead 200mtr & lift 10 mtr.
18.86
201707
10695
... More
Providing and laying lime concrete on Floor with 50% lime mortar 1:1:1 (1 lime :1 shurkhi :1 sand) and mix with 10mm thick brick aggregade and mixing with adhesive material with beating, leveling, finishing of surface including carriage of material and water with in lead 200mtr .
25.03
248985
9947.5
... More
Providing and applying Avg. 52 mm thick avg. lime plaster with moulded designs in arch & wall etc in three layer with lime mortar 1:1:1 (1Unslacked lime :1 surkhi :1C Sand) Ist & IInd Layer 20mm & top layer 12 mm thick finishing layer mixed with adhesive materials and finishing the top surface complete including carriage of material with in lead 200mtr. & lift 10 mtr.
179.92
210781
1171.53
... More
Provision for errection & dismentaling of tubular Scaffolding With heep of wooden planks & bamboo chali including carriage of Scaffolding from store to site Size
25
116134
4645.39
... More
Providing & Fixing MS Gate with rectangular MS Hollow pipe section with 60x40x4.5mm hollow pipe vertical & Horizontal Member Including fixing 12mm thick M.S. Square Bars in Horizontal & Vertical in every box with good welding and fixing the holdfast (Chool) with 75mm thick MS Rod in top & Bottom and fixing in Cement concrete block1:2:4 (1cement,2 sand 4 stone agg. 20mm) with primming & Painting of gate including fixing at side with all labour and materials etc complete.
1
68580
68580.04
... More
Provision for removal of malba by the mechanical transportation from the working site to dumping ground within lead 25km approx
66.83
29730
444.87
... More
Provision for Photo Documentation Before during and after complition of Conservation work ( including GST)
1
25000
25000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements