Water Resources Department Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

Water Resources Department - WRD Tender

Works
Civil And Construction
Road Construction
Opening Date14 Oct 2024
Closing Date28 Oct 2024
Tender Amount₹ 12,83,06,873.29 
Notes
Download

Costs

Summary

Remodelling And Cement Concrete Lining Of L.b.c. Between Rd 0 M. To 14940 M., R.b.c. Rd 0 M. To 2040 M., Kotrichhapar Minor Rd 0 M. To 900 M., Bhorampur Minor Rd 0 M. To 1950 M., Korray Minor Rd 0 M. To 4800 M., Kodka Minor Rd 0 M. To 1620 M., Silpatti Minor Rd 0 M. To 1800 M. With Construction Of 01 No. Escape, 11 Nos. D.c., 18 Nos. Fall, 06 Nos. Minor Head, 26 Nos. Vrb, 06 Nos. Inlet, 06 Nos. Fall Cum Vrb, Rcc Open Truff In L.b.c. Rd 3660 M. To 3810 M.,

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

431.08

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

18728.7

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

1.92

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

1238.4

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

1097.39

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

182.5

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

212.5

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

60

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

968

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

12934.69

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

11.44

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

14281.88

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

24605.22

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

495.8

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

684

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

2505.52

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

4476.83

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

86596.95

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

12511.2

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

265.38

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

2538.25

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

20

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

1798

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

208.23

139

22813657.3

... More
Excavation in all types of soil, hard moorum and rocks except hard rock including site clearance, excavation for founadation of structures, profile cutting in canal bed and side slopes for lining, sleepers, coping and under drainage arrangement and subsequent removal, dressing including re-handling and disposal of excavated material to specified place and utilization of useful materials wherever required including watering and compaction of earthwork in filling portion at OMC to dry density not bellow 90% by light roller i.e. non powered rollers of sheep foot earth masters or hand rammers etc. complete with all lead and lift of all materials in all respect and as per design, approved drawing, specifications and as directed by Engineer-in-charge.

1444.71

139

22813657.3



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.