Get tender documents at just ₹100 per tenderKnow More
Guaranteed Value-For-Money PlansNo hidden charges. No keyword restrictions.Explore Our Plansor Pay Per Tender

Urban Development And Housing Department

  • Tender Amount

    ₹ 1,257,643

  • EMD

    ₹ 25,200

  • Opening Date

    07 Feb 2019

  • Closing Date

    18 Feb 2019

Tender
Summary

Construction Work Of Drain And Pcc Road In Haroon Nagar 2 In Road No 17 From House Of Dr Shamim Saheb Perwez Saheb Ekram Saheb To House Of Atif Riyjuddin Saheb In Ward No 09 Under Nagar Parishad Phulwari Sharif

in Rs. in word 1 2 3 4 6 1 4.1 (A) Rcd Granular Sub-base with Close Graded Material (Table:- 400-1) Granular Sub-base with Close Graded Material (Table:- 400-1) Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) (ii) for grading- II Material as per specification and direction of E/I. 67.80 m³ 2703.10 183270.00 Bill of Quantity for NAME OF WORK :- Construction work of drain and pcc road in haroon nagar 2 in road no 17 from house of dr shamim saheb perwez saheb ekram saheb to house of atif riyjuddin saheb in ward no 09 under nagar parishad phulwari sharif Date of Tender :- 21.01.19 NIT No.- 13/2018-19 (E-Tendering) Group :- 13 B.O.Q. Amount :- 12,57,643.00 Earnest Money :- Rs. 25,200.00 Time of Completion :- 4 Month Cost of BOQ :- Rs. 2500.00 (In shape of Demand Draft only) Bid Processing Fee :- (Through online payment) Rs. 1180.00 Amount 5 Sl. No SOR Particulars Quantity Unit Rate Page 1 of 6 in Rs. in word 1 2 3 4 6 Amount 5 Sl. No SOR Particulars Quantity Unit Rate 2 4.1.2 Bcd Providing and laying in position cement concrete of specified grade excluding the cost of centring andf shuttering all work upto plinth level : 1:1.5:3 (1 cement : 1.5 Coarse Sand : 3 Grade Stone Aggregate 20 mm nominal size) etc. all complete as per building specifications and direction of E/I. 93.60 m³ 6226.20 582772.00 3 5.9.1 Bcd Providing centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of column etc. for mass concrete etc. all complete as per building specifications and direction of E/I. 40.97 m² 186.30 7633.00 Hume Pipe Drain 4 2.8.1 Earth work in excavation in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m : All Kinds of soil all complete as per building specifications and direction of E/I. 91.22 m³ 319.60 29154.00 5 2.28. Bcd Supplying and filling in plinth with local sand and under floors including watering, ramming consolidating and dressing all complete job as per specification and direction of E/I. 10.03 m³ 500.65 5022.00 6 4.1.5 Bcd Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level : 1:3:6 (1 cement : 3 Coarse Sand : 6 Grade Stone Aggregate 20 mm nominal size) etc. all complete as per building specifications and direction of E/I. 10.04 m³ 5267.98 52891.00 Page 2 of 6 in Rs. in word 1 2 3 4 6 Amount 5 Sl. No SOR Particulars Quantity Unit Rate 7 4.1.3 Bcd Providing and laying in position cement concrete of specified grade excluding the cost of centring andf shuttering all work upto plinth level : 1:2:4 (1 cement : 2 Coarse Sand : 4 Grade Stone Aggregate 20 mm nominal size) etc. all complete as per building specifications and direction of E/I. 10.035 m³ 5835.87 58563.00 8 19.3 5.1 Bcd Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. Pipes including collars/ spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete job as per building specifications and direction of E/I. 450 mm dia RCC Pipes 109.15 m 1998.50 218136.00 9 5.9.2 Bcd Providing centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pitasters Buttresses plinth and string coarses etc. all complete as per building specifications and direction of E/I. Walls 21.96 m² 321.30 7056.00 Chamber size 3'6"x3'6"x3'6" internal 1'10" x 1'10" x 3'6" 10 2.8.1 Ear

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.