Road Construction Department Tender

With BidAssist, you can search for multiple business options for RWD Bihar tenders, RCD Bihar tenders, and any other e tender Bihar government is inviting bids for. Such Bihar tenders are posted on the eprocurement Bihar website, and on this page, you will get consolidated lists of Bihar tenders that can be sorted based on authority, department, city, and more.

Road Construction Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date27 Jun 2022
Closing Date2 Jul 2022
Tender Amount₹ 3,02,83,140 
Notes
Download

Costs

Summary

Construction Of Hl Rcc Bridge At At 3.650 Km Of Bishrampur To Murgadha-narayanpur Road

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Bored cast in situ M-35 grade RCC Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with al lifts and lead upto 1000 m. 1200 mm Dia

396

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

65.1

-

-

... More
Providing steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing

1.6

-

-

... More
Providing and Constructing Temporary Earth Island (Assuming depth of water 1.0 m and height of island to be 1.25 m including Royality for earth @ Rs. 8289.60.00 for each Island.)

1

-

-

... More
Providing and Constructing one span service road to reach island location from one pier location to antother pier location including Royalty from earth @ 495.00/m

36.08

-

-

... More
SUBSTRUCTURE : R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification, RCC M-30 i) Upto 5m height (Using Concrete Mixer)

146.74

-

-

... More
R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification, RCC M-30 ii) From 5m upto 10m height (Using Concrete Mixer)

10.12

-

-

... More
R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification, RCC M-35 ii) From 5m upto 10m height (Using Concrete Mixer)

8.95

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

29.04

-

-

... More
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, completre assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete asper drawing and approved technical specifications.

12

-

-

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.

112500

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

132

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 I) Sandy Material

154.41

-

-

... More
Providing and laying filter media with granular crushed aggregates (Jhama Metal) as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

84.04

-

-

... More
SUPERSTRUCTURE : Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 II. RCC M-30 (Height 5m to 10m)

125.11

-

-

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202

20.75

-

-

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

24.73

-

-

... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3

87.92

-

-

... More
Drainage Spouts complete as per drawing and technical specifications Clause 1209

16

-

-

... More
P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.

7.16

-

-

... More
Reinforced Cement Concrete M-30 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211

16.97

-

-

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

25.35

-

-

... More
Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.

16.9

-

-

... More
PROTECTION WORK : Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302

204.56

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

72.66

-

-

... More
Providing and fixing of road stud 100 x 100 mm die cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling holes 30 mm upto a depth of 600 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS:873 (Part 4) 1973.

100

-

-

... More
Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701

1.92

-

-

... More
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground leve, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS: 1367 and IS: 1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810

40

-

-

... More
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade

1000

-

-

... More
Diversion Works : Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. (1000mm Dia)

45

-

-

... More
Earth work in road embankment with ordinary soil ( vide classification of soil item - A)obtained from borrow pits ( Maxm. 1 km. lead ) all complete job as per Technical Specification of MoSRTH.

720

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401 Grading-I

33.75

-

-

... More
Routine Maintenance amount for 1st year

36

-

-

... More
Routine Maintenance amount for 2nd year

36

-

-

... More
Routine Maintenance amount for 3rd year

36

-

-

... More
Routine Maintenance amount for 4th year

36

-

-

... More
Routine Maintenance amount for 5th year

36

-

-

... More
12% GST Amount (Construction and Maintenance)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.