Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

Central Public Works Department

Nalanda, Bihar

  • Opening Date

    03 Sep 2019

  • Closing Date

    12 Sep 2019

  • Tender Amount

    ₹ 7,25,229

  • EMD

    ₹ 14,505

Are you Looking for Joint Venture Partners, Contractor Consortium, Back-to-Back Contractor, Project Financier?
We will help you to find the right match for FREE.
Summary

Providing Air Conditioner and Geyser for Furnishing

Don't have sufficient eligibility, BG funds or resources?
We will help you to find the right match for FREE.
BOQ Items

No BOQs Available

ADDITIONAL CONDITIONS Name of work:- Providing Air Conditioner and Geyser for furnishing of GO's Mess for RTC- V, CRPF at RTC, Rajgir. (SH:- SITC of Split type AC & Water Geyser). NIT No.:- 31 /NIT/EE(E)/PCED/2019-20 The work shall be carried out as per CPWD specification for electrical works Part-I (Internal) 2013, HVAC-2017 Part-II (External) 1994, amended up to date and as per additional specifications and conditions for this work. 1) The work should be carried out by associate agency who is specialized for such works. 2) The department reserves the right to send such materials to the manufacturers/ authorized test laboratory to verify the genuineness and quality of the product. 3) All material shall approved charge for Engineer –In-Charge before installation. 4) The contractor is advised to visit the site before quoting for this tender to apprise himself about the site environments and other conditions. Drawings and inventories can be seen in the office of undersigned. 5) The make & model of AC unit shall be got approved from Engineer-in-charge before award of work. The model should be of latest design and should be readily available in market. 6) All the cooling coil of AC should be copper tube only. 7) The contractor shall be responsible for any damage done to the building or electrical installations during the execution of the work. Damage, if any shall have to be made good by the contractor at his own cost failing which the same shall be got rectified I made good at the risk and cost of the contractor. 8) The work shall be carried out in engineering like manner and bad workmanship shall be rejected summarily. For redoing the job, no claim of the contractor shall be entertained on this account. 9) The site shall be cleared of malba, debris caused by working at site by the Elect. Contractor without any extra cost to the department. 10) The contractor or his authorized representative shall sign the site order book and comply with the remarks entered therein by the representative of the Department. 11) Wherever make of materials is not mentioned the contractor shall quote clearly the make in his tender. 12) The contractor will ensure that all the skilled persons managed / deployed for executing the electrical work possess the wireman license issued by approved authorities. Consequences arising due to the default of the contractor to comply with this condition would be contractor’s responsibility only. 13) The contractor will make his own arrangement for storage of his own material, and if issued to him departmentally. The material, if issued, shall be issued to him from JE (E)’s store. The watch and ward of the materials and of the installations would be responsibility of contractor till the work is completed / handed over to the department. Nothing extra shall be paid to the contractor on this account. The contractor shall make his own arrangement for carriage of materials, fittings, cables etc. issued to him departmentally from the site store to the site of work at his own cost. Nothing extra shall be paid on this account. 14) Approved makes of materials to be used in the work are as under: a Split type AC : LG/Voltas/Lloyed/Diakin b Water Heater Geyser : Bajaj/Murphy/Havells/Crompton 15). The contractor shall be responsible for the safe custody of the electrical installation in the building, including fitting and fixtures till the installations handed over to the department. He should make his own arrangement for proper watch and ward at his risk and cost. No claim will be entertained on this account. 16). The work is to be carried out in workman liked manner and generally in accordance with the plans. However the contractor will be bound to carry out the work with minor deviation over the plan supplied if desired by the Engineer-in-charge of the work. 17). All chases holes recesses

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.