BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 7,27,820Document Cost
₹ 7,300Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_BoTC_35000_1Bid Award Id
ViewTender No
CHDI/ ET-24/2022-23/27Tender Authority
Bodoland Territorial Council ViewPurchaser Address
-Website
http://https://www.bodoland.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Cement Concrete work in proportion 1: 4: 8 with aggregate of size 13 mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) A) River Singles (iv)With shuttering & without Dewatering
269.99
-
9052.24
Dewatering
269.99
-
551.69
Cement Concrete work in proportion 1: 2: 4 with aggregate of size 13 mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Temporary arrangement for obtaining clear water should be made at site.) A) River Singles (iv)Without shuttering & with out Dewatering
404.67
-
10093.83
Dewatering
404.67
-
551.69
RCC work in proportion 1: 2: 4 with aggregate of size 13 mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Temporary arrangement for obtaining clear water should be made at site.) A) River Singles (ii)With shuttering & without Dewatering
765.74
-
10165.47
Dewatering
421.1
-
551.69
Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.
440.96
-
14853.98
Providing weep holes with 50 mm dia GI pipes ofrequired length and depth fitted with vertical non return valve (50 mm) of brass inside including cost of making filter of size 0.6 M x 0.6 M x 0.6 M fitted with graded filter media at back side and covering the back side with MS wire netting in the abutment, face wall wall of Head Work including shuttering for providing space at the time of casting cement concrete including supplying fitting bend, nipple, etc, complete as directed.
50
-
3365.01
12 mm cement plastering including clearing surface and curing, complete as directed.(i) in prop 1:3
748.66
-
256.49
Collection and supply of one man size 23cm to 30cm collected manually from quarry rocks; stacking at quarry site including payment and forest royalties etc. complete as directed.
360.81
-
1886.24
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope with voids filling and local carriage of boulders from a distance of 50 m with lift up to 3.00 m Complete as directed.
360.81
-
905.67
Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed.
2138.76
-
401.96
Supplying, fitting, fixing of steel gate of cross & Head Regulator as per design & drawing & specification including supplying of steel beams, channel section, Rubber seal etc including all materials embedded partly where necessary & manually operated chorister equip mints including carriage of all materials to work site complete.
4.44
-
90312.25
Collection and supply of gravel free from dust, dirt and other foreign materials, paying forest royalty, sales tax etc. at work site including stacking in measurable stacks complete as directed. (Considering average distance of 25 Km and 50 km) D) Hard river gravels 13mm to 38mm size Distance of work site from quarry @ 50 Km
239.33
-
3611.5
Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete including all carriage etc.
239.33
-
528.56
RCC work in proportion 1: 1 ½: 3 with aggregate of size 6 mmto 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) a) River Singles (iii)Without shuttering & with Dewatering
53.85
-
12693.69
Supplying and mixing rapidite in concrete works below ground water level where necessary etc. complete as directed.
1768.5
-
164.82
Afflux Bund and D/S Protection Earth work in filling in marginal bund/ Guide bund/ Afflux bund/ Canal embankment etc. in the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungles, removing trees up to 15cm dia and uprooting roots and stumps from the seat of the embankment and borrow pit area, breaking clods not more than 10mm cube, ramming, dressing, watering and roughening the seat of the embankment before throwing earth, profiling etc., paying compensation of earth borrowed from private land or forest land if any, lead up to 30m and lift up to 1.5m, complete as directed.
4575.4
-
249.95
Earth work in excavation of diversion/ feeder channel to the design section and grade by depositing the spoils in the form of embankment on either side to the design section and grade in layers not exceeding 15cm thick including clearing light jungles and trees up to 15cm dia uprooting roots and stumps from the seat of the embankment and canal free from all vegetation including breaking clods not more than 10mm cube dressing, ramming, bailing out stagnant rain water where necessary complete as directed with lead up to 30m and lift up to 1.5m.
180
-
255.54
Cement Concrete work in proportion 1: 3: 6 with aggregate of size 13mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) A) River Singles (i)Without shuttering & without Dewatering
25.2
-
9040.47
RCC work in proportion 1: 2: 4 with aggregate of size 13 mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Temporary arrangement for obtaining clear water should be made at site.) (iv)With shuttering & with Dewatering
111.6
-
11581.19
Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.
20.88
-
14853.98
Plum concrete work in 40% plum hard boulder 15cm to 23cm size and filling the interstices with 60% of C.C. in prop. 1:3:6 of 13 mm to 38 mm aggregate including shuttering, curing etc. complete as
directed. (Temporary arrangement for obtaining clear water should be made at site.) (Av. Quarry distance = 25 KM)
130.5
-
6685.91
Construction of boulder sausage work of size 1.00 m x 1.00 m, including suppying of all materials with 23 cm to 30 cm size river boulder collected from a lead of 50.00 KM encaged in 15cmx15cm mesh in 8G/10G hexagonal wire netting of filling the voids between boulder tied with 10G/18G galvd tying wire at 30 cm apart laid in position as per direction including necessary local carriage of materials paying necessary forest royalty including providing 1.00 no. of whole Jati bamboo horizontal runner along the top of the sausage with vertical bhaluka bamboo post 1.50 m apart driven at least 0.60 m below ground and tying with sausage etc. all complete as directed.
57.74
-
7137.02
Diversion Channel and Closing Bund
Earth work in excavation of diversion/ feeder channel to the design section and grade by depositing the spoils in the form of embankment on either side to the design section and grade in layers not exceeding 15cm thick including clearing light jungles and trees up to 15cm dia uprooting roots and stumps from the seat of the embankment and canal free from all vegetation including breaking clods not more than 10mm cube dressing, ramming, bailing out stagnant rain water where necessary complete as directed with lead up to 30m and lift up to 1.5m.
1240.5
-
255.54
Earthwork in all soils in canal embankment & bed filling as per designed section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private, if any loading, unloading and stacking at not more than 1.00 M height and spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungles, removing trees upto 15 cm dia & uprooting roots & stumps etc. from the seat of embankment, breaking clods to not more than 10 mm cube, ramming, dressing, roughening the seat of embankment, profiling etc. with all lead and lift complete as directed.
375.42
-
490.05
Construction of whole bamboo single pallasiding with matured Bhaluka bamboo pst 7.50 cm to 10 cm dia 5 cm clear apart 1.50 m to 1.00 m above ground and 1.00 m to 1.2o m below ground with jati bamboo structs placed 1.20 m to 1.50 m apart tied with galvd. wire of 16 G to 18 G and complete with three rows half jati bamboo kamies.Complete as directed.
72
-
1932.11
Supplying and laying of empty cement bags filled with sand/earth (As locally available) including stiching the mouth,laying,fixing in position with supply of bags,sutlies etc. Complete as directed.
2572
-
52.93