Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDAP_1780_1Bid Award Id
ViewTender No
TZND/TandA-03/2023-24/03Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://arunachaltenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring an shuttering in:
a) Foundations and plinth :
111.21
-
-
Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) excluding the cost of centring an shuttering in:
b) Walls including attached buttresses, pilasters and their caps and bases and string courses etc. up to floor two level.
13.9
-
-
SH:-RCC WORKS
-
-
-
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
73.78
-
-
Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement.
a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
40.64
-
-
Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement.
a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
41.7
-
-
SH:-CENTERING and SHUTTERING
-
-
-
a) Foundation, footings, bases of columns etc.
369.99
-
-
b) Column, pillars, posts and struts etc.
641.6
-
-
c)Lintels, beams, girders, bressumers and cantilevers etc.(P/Beam)
168.96
-
-
e) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
168.96
-
-
e) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
112.28
-
-
SH:-REINFORCEMENT OF RCC WORK
-
-
-
a) Foundation, footings, bases of columns etc.
9463.6
-
-
SH:BRICKWORK
-
-
-
Brick work with best available local bricks in foundation and plinth in cement mortar 1:3 (1 cement : 3 fine sand).
547.5
-
-
Extra for brick work with best available local bricks in superstructure above plinth level up to floor two level.
547.5
-
-
SH:FINISHINGS
-
-
-
12 mm cement plaster 1 : 3 (1 cement : 3 fine sand) .
1095
-
-
SH:STEEL WORKS
-
-
-
Steel work in built up tubular trusses including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer welded and bolted including special shaped washers etc complete (welding to be paid separately).
10.37
-
-
SH:STEEL GATE
-
-
-
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
13.19
-
-
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :Foundations and plinth
1.53
-
-
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :
a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
0.9
-
-
Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement.
a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
1.3
-
-
Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement. a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
0.3
-
-
Centring and shuttering including strutting, propping etc and removal of form work for :
-
-
-
a) Foundation, footings, bases of columns etc. and mass concrete.
2.9
-
-
b) Column, pillars, posts and struts etc.
13
-
-
c) Lintels, beams, griders, bressumers and cantillevers etc.
2.7
-
-
SH:-REINFORCEMENT OF RCC WORK
-
-
-
Reinforcement of RCC work including bending, binding and placing in position complete. b) Cold twisted bar
532.1
-
-
SH:STEEL WORKS
-
-
-
Steel work in single section including cutting, hoisting, fixing in position and applying a priming coat of red lead paint.
A) In Tees, Angles and Channels
3.9
-
-
SH:FINISHINGS
-
-
-
Applying one coat of cement primer of approved brand and manufacture on wall surface.
8.2
-
-
Finishing walls with water proofing cement paint of approved brand and manufacture and required shade on new work (three or more coats) to give an even shade