Public Works Department Tender
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date14 Feb 2024
Closing Date21 Feb 2024
Tender Amount₹ 1,34,15,600
Costs
EMD
₹ 1,34,200Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDAP_1668_1Bid Award Id
ViewTender No
BDL/TandA-26/2023-24/198Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://arunachaltenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres )
2674.88
-
-
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.into the valley without involving any lead and lift. (Ordinary and Hard Rock)
1337.44
-
-
SH : PAVEMENT CRUST
-
-
-
Preparation of Sub-Grade & WBM-I
Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.)
6897
-
-
Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade.
6897
-
-
Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.)
By Manual Means
Grading- I (Using Screening Crushable type such as Moorum or Gravel)
Using Screening Type-A (13.2mm Agg.)
834.54
-
-
SH : RCC Slab Culvert 1.50 m Span
-
-
-
A. SLAB CULVERT
'Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
'Ordinary soil
'Manual Means
'3 m to 6 m depth
382.5
-
-
'Sand Filling in Foundation Trenches as per Drawing & Technical Specification
20.4
-
-
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
20.4
-
-
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and Technical Specification
b)Random Rubble Masonry
67.56
-
-
In Foundation Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and Technical Specification b)Random Rubble Masonry
In Sub-Structure
114.9
-
-
Providing & fixing weep holes in head wall, return wall, wing wall and retaining wall complete as per drawings and Technical Specifications Clause 2706.
24
-
-
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
18
-
-
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
B. RCC Grade M25
Case I. Using Concrete Mixer
(i) For solid slab super-structure, 20-30% of (a+b+c)
q. Height upto 5m
5.19
-
-
a) Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications
1.72
-
-
(SH : Katcha DRAIN)
-
-
-
Surface Drains in Soil (Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres))
Mechanical means
5500
-
-
(SH : CC DRAIN)
-
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with Ordinary soil
412.5
-
-
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
147
-
-
SH : RRM Retaining Wall 2.00 m Height
-
-
-
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
221.52
-
-
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
15.44
-
-
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and Technical Specification. ( Random Rubble Masonry.
294.24
-
-
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
80
-
-
SProviding and laying filter media behind box structure, wing wall, retaining wall and return wall complete as per drawings and Technical Specifications Section 305 and 2500.
27.04
-
-
SH : Breast Wall 2.0 mtr. Ht.)
-
-
-
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
120.75
-
-
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
20
-
-
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and Technical Specification. ( Random Rubble Masonry.
173
-
-
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
50
-
-
SProviding and laying filter media behind box structure, wing wall, retaining wall and return wall complete as per drawings and Technical Specifications Section 305 and 2500.
18.75
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements