Transmission Corporation Of Andhra Pradesh Limited Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender

Civil And Construction
Opening Date12 Jun 2023
Closing Date23 Jun 2023
Tender Amount₹ 38,52,979 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc., complete for finished item of work as per directions of the Engineer-in-charge.

15

68753

4583.55

... More
Providing High Yield Strength Deformed (HYSD)/Thermo Mechanically Treated (TMT) (Fe 415 grade as per IS 1786-1979) of TISCO/SAIL/VSP make, different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

3200

217952

68.11

... More
RCC M- 20 Nominal mix (Cement 400 kgs) using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seignorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work.

-

-

-

... More
For foundations

63

611130

9700.49

... More
For Cover slabs

0.8

6966

8707.82

... More
Plastering with CM (1:3), 12 mm thick including cost & conveyance of all materials, labour charges, leads, lifts and curing complete as per the directions of the Engineer-in-charge for the finished item of work.

85

32050

377.06

... More
White washing two coats with white cement of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental charges such as scaffolding, lift charges etc., complete for finished item of work.

85

3981

46.84

... More
Supply and laying of 180 GSM LDPE sheet of approved make in the switch yard including laying the sheet neatly in between layers of crusher dust without folds to avoid the vegetation and weed growth, cutting and jointing the sheet properly including cost & conveyance of all materials, all leads , labour charges for laying complete as per the directions of the Engineer in charge for the finished item of work..

230

5060

22

... More
Supply and spreading of crusher dust in the switch yard(100mm thick) area including Suitable antiweed treatment after completion of final levelling and grading including disposal of surplus earth and filling within switch yard areaincludind cost of all materials, all leads and lifts, labour charges complete as per the directions of the Engineer in charge for the finished item of work..

12

15677

1306.48

... More
Supply and Spreading of 20mm size Hard Broken Granite metal in switch yard (100mm thick) including providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work

14

32838

2345.58

... More
Removal and Relaying of 20mm size Hard Broken Granite metal in switch yard including providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work

10

1685

168.56

... More
Brick Masonry in CM (1:6) with Common burnt clay Bricks of class as per Table-1 of IS:1077- 1992 Non-Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding charges at all leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work

4

26276

6569.22

... More
Plastering to Uneven surfaces of RR /CR, PCC with CM (1:5) 20mm. thick including cost & conveyance of all materials, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work.

36

13744

381.78

... More
Providing sand filling in cable duct including cost & conveyance of all materials, labour charges, leads, lifts , watering and consolidating to required density complete as per the directions of the Engineer in charge for the finished item of work( APSS No. 309&310)

3

3539

1179.78

... More
Supplying and fixing of Ashirvad/Ajay/Astral flowguard or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS(Copper Tube Sizes 1/2" ton 2" Ashirvad flowguard SDR 13.5 pipes are made from idential CPVC compounds having the same physical properties for hot and cold water(IS 15778:2007) for water supply line to earth pits / toilets including cost and conveyance of pipe, CPVC specials such as elbows, Tees concealing same in walls and floors by cutting 34.9/ 28.6/ 22.2/15.9 mm dia to be included grooves, packing, finishing after laying pipe in position as per the directions of the Engineer-in-charge for the finished item of work.

-

-

-

... More
22.2 mm OD pipe SDR 13.5

20

2085

104.25

... More
15.90 mm OD pipe SDR 13.5

5

327

65.43

... More
Supplying and fixing long body C.P. Taps including cost and conveyance, labour charges complete as per the directions of the Engineer in charge for the finished item of work.

3

881

293.67

... More
Plain Cement concrete - Nominal Mix (1:2:4) with 12 to 20mm HBG metal including cost and conveyance of all materials, labour charges, water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456)

2.5

14238

5695.26

... More
Total with out taxes

-

1181084

-

... More
GST 18% on sub total

-

212595

-

-

1393680

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.