Tirumala Tirupati Devasthanams Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Tirumala Tirupati Devasthanams Tender
Opening Date11 Sep 2024
Closing Date26 Sep 2024
Tender Amount₹ 2,51,392
Costs
EMD
₹ 2,513Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Providing Temporary Illuminations On Hire Basis To Fairs And Festivals (mahasivaratri, Hanuman Jayanthi, Vinayaka Chavithi Festival) Etc
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
752267Bid Award Id
ViewTender No
332/DE(Elec.)-II/TTD/TPT/2024-25Tender Authority
Tirumala Tirupati Devasthanams ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of festival decorative Series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
200
14354
71.77
Hire charges for supplying, fixing, wiring, servicing and maintaining of LED cup sets consisting of 50 to 100 Nos. of LED bulbs including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. (The work includes drawing of GI wire for lightening of the sets) For One day
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
100
2464
24.64
Hire charges for supplying, fixing, wiring, servicing and maintaining of LED cup sets consisting of 50 to 100 Nos. of LED bulbs including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. (The work includes drawing of GI wire for lightening of the sets) For Three days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
100
4285
42.85
Hire charges for supplying, fixing, wiring, servicing and maintaining of LED cup sets consisting of 50 to 100 Nos. of LED bulbs including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. (The work includes drawing of GI wire for lightening of the sets) For Seven days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
100
6320
63.2
Hire charges for supplying, fixing, wiring, servicing and maintaining of LED cup sets consisting of 50 to 100 Nos. of LED bulbs including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. (The work includes drawing of GI wire for lightening of the sets) For Ten days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
100
8034
80.34
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 4’ - 40Watt Strip type fluorescent fitting / T5 / LED batten fitting with all accessories including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For One day
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
100
1178
11.78
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 4’ - 40Watt Strip type fluorescent fitting / T5 / LED batten fitting with all accessories including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Three days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
50
964
19.28
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 4’ - 40Watt Strip type fluorescent fitting / T5 / LED batten fitting with all accessories including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Seven days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
50
1499
29.99
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 4’ - 40Watt Strip type fluorescent fitting / T5 / LED batten fitting with all accessories including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
50
1874
37.49
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 250 / 400W Metal Halide flood light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For One day
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
100
28278
282.78
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 250 / 400W Metal Halide flood light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Three days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
20
9104
455.24
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 250 / 400W Metal Halide flood light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Seven days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
20
12853
642.69
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 250 / 400W Metal Halide flood light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
10
7498
749.81
Hire charges for Supplying, Wiring, Servicing & Maintaining 500 / 1000W Halogen Fitting Complete including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For One day
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
50
3535
70.7
Hire charges for Supplying, Wiring, Servicing & Maintaining 500 / 1000W Halogen Fitting Complete including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Three days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
50
6427
128.54
Hire charges for Supplying, Wiring, Servicing & Maintaining 500 / 1000W Halogen Fitting Complete including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Seven days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
50
10711
214.23
Hire charges for Supplying, Wiring, Servicing & Maintaining 500 / 1000W Halogen Fitting Complete including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
50
13389
267.79
Hire charges for supplying, fixing, wiring and 3 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
5
10979
2195.86
Hire charges for supplying, fixing, wiring and 10 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
2
7283
3641.91
Hire charges for supplying, fixing, wiring, servicing and maintaining pedestal fan / Pedestal 18/24” Air circulators with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For One day
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
50
15692
313.85
Hire charges for supplying, fixing, wiring, servicing and maintaining pedestal fan / Pedestal 18/24” Air circulators with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Three days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
30
18477
615.91
Hire charges for supplying, fixing, wiring, servicing and maintaining pedestal fan / Pedestal 18/24” Air circulators with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Seven days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
5
4391
878.34
Hire charges for supplying, fixing, wiring, servicing and maintaining pedestal fan / Pedestal 18/24” Air circulators with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
5
4948
989.74
Hire charges for supplying, fixing, wiring, servicing and maintaining Jumbo Air cooler Heavy duty with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For One day
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
2
4498
2249.42
Hire charges for supplying, fixing, wiring, servicing and maintaining Jumbo Air cooler Heavy duty with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Three days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
2
8483
4241.75
Supply, Transportation of Diesel Oil for DG set
50
4877
97.55
(Rupees Two Lakh Fifty One Thousand Three Hundred Ninety One and Paise Eighty Six Only)
-
251391
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements