Municipality Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Municipality Tender

Civil And Construction
Drainage Work
Opening Date25 Jun 2022
Closing Date12 Jul 2022
Tender Amount₹ 9,01,023 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of CC Drains;Filling sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH etc., Complete as per SS and as directed by the deparmental officer incharge of the work. but excluding seigniorage charges

39.75

-

22954.03

... More
Construction of CC Drains;P.C.C (1:4:8) using 40mm HBG metal from approved quarrry including cost and conveyance of all materials, labour charges for mixing, centering charges,, etc., Complete as per SS and as directed by the deparmental officer incharge of the work. but excluding seigniorage charges

39.75

-

135662.38

... More
Construction of CC Drains;Providing Concrete for plain /reinforced concrete (1:3:6) Nominal mix in open foundations using 20 mm nominal size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including cutting for 14 days complete as per drawings and technical specifications Complete as per SS and as directed by the deparmental officer incharge of the work. but excluding seigniorage charges, Drain bed

39.75

-

165974.93

... More
Construction of CC Drains;Providing Concrete for plain /reinforced concrete (1:3:6) Nominal mix in open foundations using 20 mm nominal size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including cutting for 14 days complete as per drawings and technical specifications Complete as per SS and as directed by the deparmental officer incharge of the work. but excluding seigniorage charges, Drain side walls

87.53

-

379580.85

... More
Construction of CC Drains;RCC M- 20 Nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering for culvert bed blocks and slabs

14.25

-

68273.75

... More
Construction of CC Drains;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded (BLD-CSTN-2-18)

528

-

46733.28

... More
Construction of CC Drains;Carting away of excavated earth/debris to a lead of 1 Km. The rate including conveyance charges , labour charges for loading ,unloading ,etc., complete as directed by the deparmental officer in charge of the work (50% of item )

154

-

5189.8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.