Municipal Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipal Corporation Tender
Civil And Construction
Drainage Work
Opening Date20 Aug 2024
Closing Date9 Sep 2024
Tender Amount₹ 16,76,331
Costs
EMD
₹ 16,763Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
748948Tender No
ET No.101/2023-24 Item No.07Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://www.gunturcorporation.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Earthwork excavation in Ordinary soil by Mechanical Means upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (RBR-FNDN-1(B)) - 1 Cum
434.16
55603
128.07
Filling of Stone Crusher Dust for foundation trenches including cost and conveyance off all materials and all labour charges ramming,watering etc, as per drawing and technical specification in Clause 305.3.9 MORD & 304 MORTH
80.8
54409
673.38
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. BED
80.8
393912
4875.15
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. BODY WALLS
98.41
525660
5341.53
Providing Plasteing with CM (1:3), 12 mm thick including Cost & Conveyance of all materials and labour charges for mixing and curing etc., Complete as per S.S.
684
277478
405.67
VRCC M-20 Design mix (Cement: fineaggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shutteing for culvert slabs
8.28
48267
5829.34
Laying of Plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 / 53 grade at cement as per Clause 1501.2.2 M30 (Grade) at 400 kg per cum, coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork, spreading the concrete with shovels, rakes, compacted using needle and plate vibrators and finished in continuous operation including curing of concrete slabs for 28- days and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. Culverts approaches
11.34
71190
6277.81
Providing High Yield Strength Deformed (HYSD) Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. ( APSS No.126)
910.8
83885
92.1
Bailing out of Water using with mechnical poer oil engine including fuel driver helper and all operational charges etc., coplete as s.s.
240
20069
83.62
Carting away the surplus excavated earth from the work site with a lead of 1 km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc., complete - 1 Cum.------mechanical
444.53
60910
137.02
Provision for Seignorage Charges
-
29396
-
Provision for NAC @ 0.10%
-
1706
-
Provision for GST @ 18%
-
307338
-
Provision for TPQA @ 0.749 %
-
12556
-
Unforeseen item
-
372673
-
TOTAL
-
2400000
-