Endowments Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Endowments Department Tender

Works
Civil And Construction
Building Construction
Opening Date8 Nov 2024
Closing Date22 Nov 2024
Tender Amount₹ 30,58,112 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(Construction of Vahanasala in the premises of Temple)Earth work excavation for foundation and depositing at site with intial lead and lift in Loamy,clayey soils like black cotton,red earth and ordinary gravel including all operational,incidental,labour charges such as shoreing,sheeting,planking shuttering etc.,complete for finished item of work as per SS.

33.96

277

9437

... More
Filling with sand in foundations & basement from approved source to site including cost and conveyance of all materials and all labour charges etc., for finished item of work as per SS

21.99

1480

32554

... More
P.C.C(1:4:8) using 40mm size H.G.metal upto Plinth level including cost and conveyance of all materials and all labour charges etc., complete for finished item of work as per SS

9.35

5183

48463

... More
VRCC- M20 using 20mm size H.G m/c graded metal including cost and conveyance of all materials and all labour charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as per SS

-

-

-

... More
column footings

3.62

10521

38088

... More
Pedastals

2.72

11110

30221

... More
columns

2.83

13765

38957

... More
Plinth Beam

3.27

13122

42912

... More
Lintels

0.92

13797

12694

... More
Roof Beam

4.09

12738

52098

... More
Roof slab 5" thick

41.85

15090

63154

... More
kodangai

23.25

1426

33165

... More
Plain sunshade

5.58

1146

6397

... More
Providing Hysd steel bar of different diameter including cost and conveyance of all materials and all labour charges for cutting,bending to required size and shapes placing in position with cover blocks and tying with binding wire,forming grills for reinforcement work as per approved designs and drawings and including all wastages such as overlaps couplings,welded joints,chairs,spacers etc.,complete for finished item of work in all floors

3.55

92982

330088

... More
Ornamental Brick work with C.M(1:5) using 2nd class bricks from approved source having minimum crushing strength of 35kg/sqcm including cost and conveyance of all materials like cement,sand,bricks,water etc.,to site and labour charges like cement mortar mixing,scaffolding charges,construction of masonary,lift charges,curing etc.,complete for finished item of work as per SS

1.83

11527

21095

... More
Brick work with C.M(1:6) using 2nd class bricks from approved source including cost and conveyance of all materials and all labour charges etc.,complete for finished item of work.(Up to basement)

1.87

8201

15336

... More
Superstructure

18.62

8672

161478

... More
S&F of FullyPanneled Doors External or Internal moulded pannels SS 290 including cost of Medium Class Teak wood , wrought and putup, labour charges for making, necessaryfixtures and fittings and fixing in positon etc., complete with size Frame and size planks:

2.6

11760

30577

... More
Supplying &Fixing of Rolling Shutter made of 80x1.25mm machine rolled CRCA laths,interlocked together through their entire length and jointed together at the ends by end-locks,mounted on specially designed pipe shaft of 50mm dia nominal bore MS B-class pipe with brackets,plates,guide channels,stoppers,bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete,painted with one coat of approved steel primer,locks,ball bearings,all accessories etc.,complete for finished item of work as per special spn:1108

10.46

4901

51268

... More
Ornamental Plastering 1" to 1 1/4" thick with base plastering 1/2" to 3/4" in CM (1:3) and top finishing 1/2" thick with C.M(1:2) to bring the required ornamentation,fine rendering with neat cement including cost and conveyance of all materials,labour charges, all operational and incidental charges,curing etc.,complete to the required shape and size as per the approved drawings and as per Silpi Norms for finished item of work as per SS. (2nd Class)

30.16

13111

39544

... More
Plastering 12 mm thick in CM (1:3) with sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work.

74.24

4351

32305

... More
Plastering 12 mm thick in CM (1:5) with sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work.

84.58

4079

34505

... More
Plastering 20mm thick in CM (1:5) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS

104.11

4282

44589

... More
1st floor

14

4624

6474

... More
Flooring with Polished BETHAMCHERLA slabs minimum of 25mm thick (0.254m x 0.254m) or any other size as specified set over a base coat of CM (1:8) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete sales & other taxes on all materials including all labour charges like dressing of flooring stones to the required size, mixing of cement mortar, laying, lift charges , cost of base coat etc., and overheads & contractors profit complete for finished item of work. (APSS No.703 & 701)

35.78

10864

38874

... More
Providing impervious coat to exposed RCC roof slab surface to required slopes with CM (1:3)prop.using screened and 20mm thick(avg) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer incharge at 1 kg per 1 bag of cement,laid over roof slab including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS

35.78

6269

22433

... More
Supplying and fixing of scaffolding including cost & conveyance of all materials such as casurina poles,bamboos,bamboos mats and coir rope etc.,including all labour charges complete for finished item of work(Up to 20.0Ht)

2088

13

28397

... More
Painting to new walls with Emulsion paint 2 coats over primary coat (total3 coats) and sales & other taxes on cost of all materials including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.

307.09

2426

74512

... More
(Construction of Yagasala in the premises of Temple)Earth work excavation for foundation and depositing at site with intial lead and lift in Loamy,clayey soils like black cotton,red earth and ordinary gravel including all operational,incidental,labour charges such as shoreing,sheeting,planking shuttering etc.,complete for finished item of work as per SS.

16.98

277

4719

... More
Filling with sand in foundations & basement from approved source to site including cost and conveyance of all materials and all labour charges etc., for finished item of work as per SS

6.73

1480

9963

... More
P.C.C(1:4:8) using 40mm size H.G.metal upto Plinth level including cost and conveyance of all materials and all labour charges etc., complete for finished item of work as per SS

2.69

5183

13943

... More
VRCC- M20 using 20mm size H.G m/c graded metal including cost and conveyance of all materials and all labour charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as per SS

-

-

-

... More
column footings

1.81

10521

19044

... More
Pedastals

1.81

11110

20110

... More
columns

1.16

13765

15968

... More
First floor

0.16

14230

2277

... More
Plinth Beam

1.82

13122

23884

... More
Roof Beam

2.27

12738

28915

... More
First floor

0.45

12966

5835

... More
Roof slab 5" thick

12.13

15090

18305

... More
First floor

2.33

15319

3569

... More
kodangai

6.98

1426

9957

... More
First floor

6.98

1440

10057

... More
Providing Hysd steel bar of different diameter including cost and conveyance of all materials and all labour charges for cutting,bending to required size and shapes placing in position with cover blocks and tying with binding wire,forming grills for reinforcement work as per approved designs and drawings and including all wastages such as overlaps couplings,welded joints,chairs,spacers etc.,complete for finished item of work in all floors

1.68

92982

156211

... More
Ornamental Brick work with C.M(1:5) using 2nd class bricks from approved source having minimum crushing strength of 35kg/sqcm including cost and conveyance of all materials like cement,sand,bricks,water etc.,to site and labour charges like cement mortar mixing,scaffolding charges,construction of masonary,lift charges,curing etc.,complete for finished item of work as per SS

5.54

11190

61994

... More
1st storey

1.34

11527

15446

... More
Brick work with C.M(1:6) using 2nd class bricks from approved source including cost and conveyance of all materials and all labour charges etc.,complete for finished item of work.(Up to basement)

0.41

8201

3362

... More
Superstructure

1.23

8672

10667

... More
Ornamental Plastering 1" to 1 1/4" thick with base plastering 1/2" to 3/4" in CM (1:3) and top finishing 1/2" thick with C.M(1:2) to bring the required ornamentation,fine rendering with neat cement including cost and conveyance of all materials,labour charges, all operational and incidental charges,curing etc.,complete to the required shape and size as per the approved drawings and as per Silpi Norms for finished item of work as per SS. (2nd Class)

12.81

12075

15468

... More
1st storey

6.67

13111

8741

... More
Plastering 12 mm thick in CM (1:3) with sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work.

35.28

4351

15352

... More
First floor

4.51

4692

2116

... More
Plastering 20mm thick in CM (1:5) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS

17.15

4282

7345

... More
First floor

15.91

4624

7357

... More
Flooring with Polished BETHAMCHERLA slabs minimum of 25mm thick (0.254m x 0.254m) or any other size as specified set over a base coat of CM (1:8) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete sales & other taxes on all materials including all labour charges like dressing of flooring stones to the required size, mixing of cement mortar, laying, lift charges , cost of base coat etc., and overheads & contractors profit complete for finished item of work. (APSS No.703 & 701)

9.1

10864

9887

... More
Providing Special Ornamental plastering columns including cost & conveyance of all materials,labour charges complete for finished item of work

150

318

47715

... More
Providing cement pothicas using cement,sand,steel reinforcement,iron mesh brickbats,flat tile etc.,including cost & conveyance of all materials,labour charges complete for finished item of work

12

1897

22769

... More
Supplying and fixing of scaffolding including cost & conveyance of all materials such as casurina poles,bamboos,bamboos mats and coir rope etc.,including all labour charges complete for finished item of work(Up to 20.0Ht)

1260

13

17136

... More
Painting to new walls with Emulsion paint 2 coats over primary coat (total3 coats) and sales & other taxes on cost of all materials including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.

106.27

2426

25785



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.