Andhra Pradesh Urban Greening And Beautification Corporation Limited Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender

Opening Date23 Jun 2020
Closing Date7 Jul 2020
Tender Amount₹ 14,91,704 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Maintenance of hedge/shrub planting: Trimming of hedges/shrubs (once in 15 days) watering (once in a day @ 5 Lts/per sqmt/per day shall be provide to maintain sub soil moisture continuously). Edge cutting 0.30mtr. away from the edges/shrub (once in a month) and application of fertilizers, insecticides, Fungicides ( once in a month @ 20 gms/pit/sqmt) etc., by manually excluding cost of water and fertilizers for one year

477.5

136791

2387.28

... More
Bed preparation for Ground cover / Flower beds: Digging the trench of size 150 mm. depth, and Formation of 150 mm. (6") thick of soil mixture at 3:1:1 ratio red garden soil, farmyard manure and river sand, application of fertilizers (@ 20 gms/pit/sqmt) by making smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation etc., for complete item of work. (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt))-unit 1 Sqmt of work. (*30 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

745

132811

178.27

... More
Maintenance of groundcover/flower beds: Weeding, Trimming/pinching and keeping the ground cover in healthy condition (once in a fortnight). Watering to ground cover (one's in three day's @ 5 litres/per Sqmts shall be provide to maintain sub soil moisture continuously) by manually, excluding cost of water. for one year

745

96122

1075.2

... More
Digging of 0.75x0.75x0.75 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

161

88260

548.2

... More
Maintenance of Palms/Tree planting: Trimming (once in month), watering (once in three days @ 5 Lts/per plant shall be provide to maintain sub soil moisture continuously), formation of basins 0.30m . away from the edges (once in a month) and application of fertilizers, insecticides, Fungicides @ 20 gms/pit/sqmt) (once in quarterly) by manually, but excluding cost of water & fertilizers for month for one year

161

40896

2116.8

... More
Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants as per directions of officer in charge at site including cost of plants and conveyance of all materials and labour charges etc., plants of bag size 7" x 8" of plant height not less than 1.0 feet, 8" x 10" of plant height not less than 3.0 feet, 13" x 13" of Tree/Palm height not less than 5 feet, 13" x 13" of plant (Hedges & Shrub) height not less than 2 feet, 15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet, 18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is 0.75'' and above, 21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the stem is 1'' and above. Heights mentioned above are excluding bag height. All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off. The rates inclusive of loading, transportation to the site, unloading & handling.

1

-

-

... More
For paspalum grass

75

5625

75

... More
For Rhoeo Spathacea 5"x6"

450

4050

9

... More
For Draceana deremensis 7"x8"

250

11250

45

... More
For Hymenocallis littoralis 7"x8"

650

11700

18

... More
For Leucophyllum frutescens 7"x8"

250

5500

22

... More
For galhimia glauca 7"x8"

1000

20000

20

... More
For golden duranta 7"x8"

150

1200

8

... More
For Caesalpania pulcherrima 7"x8"

250

6250

25

... More
For Allamanda Cathartica 7"x8"

375

14250

38

... More
For Alpinia zerumbet 7"x8"

250

7500

30

... More
For Acalypha Inferna 7"x8"

400

8000

20

... More
For Chrysothemis pulchella 7"x8"

425

19125

45

... More
For pandanus gold 7"x8"

325

16250

50

... More
For Lantana camera (Red) 7"x8"

900

16200

18

... More
For Lantana camera (white) 8"x10"

750

26250

35

... More
For Wedelia Trilobota 5"x6"

18000

180000

10

... More
For Syngonium podophylum 7"x8"

2700

108000

40

... More
For Millingtonia hortensis 25"x25"

59

-

-

... More
For Tabebuia Argentina 25"x25"

8

-

-

... More
For Terminalia Catappa 25"x25"

18

-

-

... More
For Pheltophorum pterocarpum 25"x25"

10

-

-

... More
For Delonix Regia 25"x25"

10

-

-

... More
For Plumeria alba 25"x25"

21

-

-

... More
For Wodyetia bifurcata 25"x25"

35

-

-

... More
Loading and unloading of plants bag size (25"X25") at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag)

161

6582

4088.5

... More
Transportation of bag plants form Gannavaram to Guntakal (Based on the bill submitted)

12.88

30000

30000

... More
Transportation of bag plants form Hyderabad to Guntakal (Based on the bill submitted)

0.15

3000

3000

... More
Irrigation facilities - Actual payment will paid for the actual work done subjected to approval of the rates by the competent authority

1

200000

200000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.