Andhra Pradesh Urban Greening And Beautification Corporation Limited Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender

Civil Works Roads
Opening Date23 Jun 2020
Closing Date7 Jul 2020
Tender Amount₹ 12,58,414 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Hedge / shrub planting: Digging the trench of size 0.3 mtrs. depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete for item of work, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (*10 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral).

832.1

287582

345.61

... More
Maintenance of hedge/shrub planting: Trimming of hedges/shrubs (once in 15 days) watering (once in a day @ 5 Lts/per sqmt/per day shall be provide to maintain sub soil moisture continuously). Edge cutting 0.30mtr. away from the edges/shrub (once in a month) and application of fertilizers, insecticides, Fungicides ( once in a month @ 20 gms/pit/sqmt) etc., by manually excluding cost of water and fertilizers for one year

832.1

238374

2387.28

... More
Bed preparation for Ground cover / Flower beds: Digging the trench of size 150 mm. depth, and Formation of 150 mm. (6") thick of soil mixture at 3:1:1 ratio red garden soil, farmyard manure and river sand, application of fertilizers (@ 20 gms/pit/sqmt) by making smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation etc., for complete item of work. (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt))-unit 1 Sqmt of work. (*20 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

172.44

22941

133.04

... More
Maintenance of groundcover/flower beds: Weeding, Trimming/pinching and keeping the ground cover in healthy condition (once in a fortnight). Watering to ground cover (one's in three day's @ 5 litres/per Sqmts shall be provide to maintain sub soil moisture continuously) by manually, excluding cost of water. for one year

172.44

22248

1075.2

... More
Digging of 0.75x0.75x0.75 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

256

133235

520.45

... More
Maintenance of Palms/Tree planting: Trimming (once in month), watering (once in three days @ 5 Lts/per plant shall be provide to maintain sub soil moisture continuously), formation of basins 0.30m . away from the edges (once in a month) and application of fertilizers, insecticides, Fungicides @ 20 gms/pit/sqmt) (once in quarterly) by manually, but excluding cost of water & fertilizers for month for one year

256

65028

2116.8

... More
Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants as per directions of officer in charge at site including cost of plants and conveyance of all materials and labour charges etc., plants of bag size 7" x 8" of plant height not less than 1.0 feet, 8" x 10" of plant height not less than 3.0 feet, 13" x 13" of Tree/Palm height not less than 5 feet, 13" x 13" of plant (Hedges & Shrub) height not less than 2 feet, 15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet, 18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is 0.75'' and above, 21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the stem is 1'' and above. Heights mentioned above are excluding bag height. All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off. The rates inclusive of loading, transportation to the site, unloading & handling.

1

-

-

... More
For Shade grass

250

18750

75

... More
For Korean grass

100

18000

180

... More
For Duranta speciosa 7" x 8"

1418

31196

22

... More
For Acalypha infema 7" x 8"

1240

24800

20

... More
For Acalypha rosea red 7" x 8"

786

15720

20

... More
For Acalypha green dwarf 7" x 8"

563

9008

16

... More
For Murraya paniculate 7" x 8"

765

19125

25

... More
For Jathropha vari 7" x 8"

1650

33000

20

... More
For Tecomaria capensis 7" x 8"

525

11550

22

... More
For Nerium oleander 7" x 8"

1375

30250

22

... More
For Rhoeo spathacea 5" x 6"

1400

12600

9

... More
For Pandanus 7" x 8"

1613

29034

18

... More
For Tabernaemontana coronaria dwarf 5" x 6"

436

6540

15

... More
For Roystones regie 25" x 25"

21

-

-

... More
For Wodyetia bifurcata

38

-

-

... More
For Mimusops elengi 25" x 25"

14

-

-

... More
For Plumeria acutifolia alba 25" x 25"

7

-

-

... More
For Peltophorum petrocarpum 25" x 25"

22

-

-

... More
For Dolnix regia 25" x 25"

2

-

-

... More
For Tabebuia rosea 25" x 25"

10

-

-

... More
For Tabebuia avellanedae 25" x 25"

22

-

-

... More
For Bauhinia blakeana 25" x 25"

10

-

-

... More
For Spathodea campanulate 25" x 25"

12

-

-

... More
For Swietenia macrophylla 25" x 25"

80

-

-

... More
For Ficus panda 25" x 25"

8

-

-

... More
For Phyllanthus emblica 25" x 25"

2

-

-

... More
For Ficus religiosa 25" x 25"

2

-

-

... More
For Prosopis cineraria 25" x 25"

2

-

-

... More
For Azadirachta indica 25" x 25"

2

-

-

... More
For Neolamarckia cadamba 25" x 25"

2

-

-

... More
Loading and unloading of plants bag size (25"X25") at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag)

256

10466

4088.5

... More
Transportation of bag plants form Gannavaram to Bhimavaram (Bassd on the bills submitted)

21.76

13056

600

... More
Transportation of grass form Hyderabad to Bhimavaram (Based on the bills submitted)

3.5

4900

1400

... More
Irrigation facilities - Actual payment will paid for the actual work done subjected to approval of the rates by the competent authority

1

100000

100000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.