Andhra Pradesh Industrial Infrastructure Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Industrial Infrastructure Corporation - APIIC Tender

Road Construction
Opening Date2 Dec 2021
Closing Date13 Dec 2021
Tender Amount₹ 22,82,83,709 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthworks

-

-

-

... More
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m

1735.44

-

185

... More
Excavation for roadwork in Marshy Soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m

433.86

-

138

... More
Excavation for roadwork in Hard Rock (blasting prohibited) with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m

309.9

-

923

... More
Excavation for roadway in hard rock (controlled blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres

309.9

-

258

... More
Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres

309.9

-

203

... More
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction.

2703.95

-

67

... More
Construction of road embankment with approved material and roadway excavation... as per drawing and technical specification

-

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2.

1735.44

-

154

... More
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.

66011.56

-

486

... More
Forming subgrade with Gravel brought from approved local source spreading in layers not more than 150mm thick, sectioning to required camber & gradient, watering and compacting each layer to proctors density with OMC compaction using 80 to 100 KN capacity vibratory roller including cost and conveyance of all materials (viz), gravel, water etc., to site,seigniorage charges, hire and operational charges of power roller and other T&P etc., complete duly maintaining the required camber & gradient in the formation as directed by Engineer-in-Charge

9456.42

-

786

... More
Construction of median and Island above road level with approved material brought from borrow pits, spread, sloped and compacted as per clause 408

1540.74

-

534

... More
Construction of earthen shoulders with granular sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401

734.41

-

747

... More
Construction of shoulders with approved Gravel material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2

716.05

-

747

... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401

3415.87

-

1962

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

3141.7

-

2660

... More
Pavement Courses-Flexible

-

-

-

... More
Providing and applying Prime Coat with bitumen emulsion (SS1) Bulk using emulsion pressure distributor on prepared surface of granular base including clearing of road surface and spraying emulsion at the rate of 0.60 kg/sqm using emulsion pressure distributor for finished item of work etc., complete as per MoRT&H Specification 502 (5th revision) and as directed by the Engineer-in-charge.

12567.82

-

38.5

... More
Providing and applying Tack coat with bitumen Emulsion (RS1) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

22220.8

-

8.9

... More
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.

589.6

-

8754

... More
Providing and laying of Bituminous Concrete with 100 - 120 TPH batch type hot mix plant using hard blasted granite crushed aggregates of Grading – II as per Table 500-17, premixed with Bituminous binder of VG 30 Grade as per jobmix formula with a minimum of 5.4 % by mass of total mix and filler, transporting the hot mix to work site, laying with hydrostatic sensor paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge

353.96

-

9535

... More
Protection Works

-

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the engineer including preparation of ground, fetching of sods and watering.

240

-

55.6

... More
Add for Intersection

-

-

-

... More
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification

361.8

-

1353

... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications

723.6

-

1783

... More
Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade on M-15 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409

1911.92

-

318

... More
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810

-

-

-

... More
At pitching sections

360

-

2555

... More
Providing and construction of lined surface /sub surface drains to the required lines and grades, including all labours, materials and machinery with all leads and lifts as per the drawing and Technical Specification Clause 309 and section 1700.

-

-

-

... More
a) RCC drain - 1.5 x 1.5 m with 0.15 m thick wall and slab sections(At start & end of Approach Road)

396

-

6216

... More
b) Earthen drain considering both sides

1391

-

130

... More
Major Bridge

-

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

-

-

-

... More
Depth up to 3m (Abutment Left, Abutment Right, Pier)

2449.44

-

130

... More
Earth work excluding hard rock

612.5

-

133

... More
Earth excavation for foundation of structure in hard rock at 50% of 3-6 mts depth

612.5

-

923

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.PCC Grade M15

122.47

-

6072

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification

24.15

-

5899

... More
ii) Approach Slab

-

-

-

... More
RCC M 20 grade for Raised kerb as per drawing and Technical Specification Using Batching Plant, Transit Mixer and Concrete Pump

147.75

-

5476

... More
Reinforced cement concrete Approach slab including reinforcement and formwork complete as per drawing and Technical specification Cement concrete M30

48.3

-

9913

... More
approach slab

-

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications For sub structure M35

-

-

-

... More
Substructure

-

-

-

... More
Abutment Stem

121.72

-

6440

... More
Abutment cap Straight portion

38.33

-

6440

... More
Abutment Dirt Wall

18.27

-

6440

... More
Haunch

2.84

-

6440

... More
P1

-

-

-

... More
Pier Stem st

44.32

-

6303

... More
Pier Stem cut waters

34.79

-

6303

... More
Pier Cap Straight Portion

63

-

6303

... More
Pier Cap Tapered Portion

43.5

-

6303

... More
P2

-

-

-

... More
Pier Stem st (upto 5m)

40

-

6303

... More
Pier Stem cut waters( (upto 5m))

31.4

-

6303

... More
Pier Stem st(5 to 10m)

11.76

-

6440

... More
Pier Stem cut waters(5 to 10m

9.23

-

6440

... More
Pier Cap Straight Portion

63

-

6440

... More
Pier Cap Tapered Portion

43.5

-

6440

... More
P3

-

-

-

... More
Pier Stem st (upto 5m)

40

-

6303

... More
Pier Stem cut waters( (upto 5m))

31.4

-

6303

... More
Pier Stem st(5 to 10m)

16.24

-

6440

... More
Pier Stem cut waters(5 to 10m

12.75

-

6440

... More
Pier Cap Straight Portion

63

-

6440

... More
Pier Cap Tapered Portion

43.5

-

6440

... More
P4

-

-

-

... More
Pier Stem st (upto 5m)

40

-

6303

... More
Pier Stem cut waters( (upto 5m))

31.4

-

6303

... More
Pier Stem st(5 to 10m)

26.64

-

6440

... More
Pier Stem cut waters(5 to 10m

20.91

-

6440

... More
Pier Cap Straight Portion

63

-

6440

... More
Pier Cap Tapered Portion

43.5

-

6440

... More
Abutment Stem

137.97

-

6303

... More
Abutment cap Straight portion

38.33

-

6303

... More
Abutment Dirt Wall

18.27

-

6303

... More
Haunch

2.84

-

6303

... More
Pedestal

10.8

-

6303

... More
Cement Concrete for Reinforced Concrete in open foundation complete as per Drawing and Technical Specification Foundation M35 Abutment Footing Straight Portion B/S,Abutment Footing Taper Portion B/S,Abutment Footing Taper Portion B/S, Pier Footing Straight Portion For 8 Piers, Pier Footing Tapered Portion For 8 Piers

1259.1

-

5783

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications Providing and laying M-30 grade Reinforced Cement Concrete Cast-in-situ Box Culvert, Wing Wall, Return Wall, Kerb with 20mm down graded crushed stone aggregates all labour, materials, machinery, (excluding reinforcement), shuttering and supporting arrangements, transporting concrete from batching plant by transit mixer, placing it in position, compacting properly with needle vibrator, moist curing for 14 days, all leads and lifts, etc. complete as per drawing , Technical Specification Clause 809and Section 1500,1700,2100 and as directed by the Engineer Return Wall, Toe Heel, Return Wall (Between two abutment), Toe and Heel (Between two abutment)

297.59

-

6216

... More
Providing and laying Gravel Backing underneath complete as per drawing and Technical specification.including cost and conveyance of materials to site and including labour charges for Gravel, complete for finished item of work as per MoRT&H specification ( 5th revision ) and as directed by the Engineer-in-Charge

575

-

786

... More
Providing and laying M40 grade Reinforced Cement Concrete with 20 mm down graded crushed stone aggregates in Deck Slab including shuttering and supporting arrangements, (excluding reinforcement) transporting concrete from batching plant by transit mixer, placing it in position, compacting with needle vibrator, moist curing for 14 days, all labour, materials, machinery, all leads and lifts, etc. complete as per drawing, Technical Specifications Section 1500, 1700 and 2300 and as directed by the Engineer.

-

-

-

... More
Solid Slab

919

-

7321

... More
Providing, precasting, transportation and placing in position precast pretensioned concrete girders as per drawing and technical specifications Girder - 2.1m : End section ,Mid section, Flair section, Girder per Span, End Diaphram Intermediate Diaphram

1515

-

13297

... More
Providing and laying M40 grade Reinforced Cement Concrete with 20 mm down graded crushed stone aggregates for Crash Barrier and Kerb (Major Bridge and Flyover) excluding reinforcement including shuttering and supporting arrangements, transporting concrete from batching plant by transit mixer, placing it in position, compacting with needle vibrator, moist curing for 14 days, all labour, materials, machinery, all leads and lifts, etc. complete as per drawing, Technical Specifications Clause 809,and Section 1500,1700,2100 and as directed by the Engineer.

-

-

-

... More
Viaduct

204.88

-

8841

... More
High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications

85

-

197170

... More
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete as per drawing and approved Technical Specifications.

-

-

-

... More
(A) 200 ton capacity fixed bearing

2000

-

285

... More
(B) 200 ton capacity sliding bearing(fixed in longitudinal direction or fixed in transverse direction)

6000

-

287

... More
(C) 200 ton capacity free bearing

8000

-

287

... More
Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.

126

-

6302

... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.

-

-

-

... More
Superstructure

-

-

-

... More
Viaduct

372.01

-

84551

... More
Substructure

180.93

-

82196

... More
Foundation

188.87

-

81872

... More
Kerb

4.43

-

84551

... More
Return Wall

23.81

-

82196

... More
Box drain

39.6

-

82196

... More
Providing and laying 65 mm thick wearing coat (25mm Mastic asphalt and 40 mm Bituminous Concrete) including all labours, material and machinery, all leads and lifts etc as per drawing

2730

-

1070

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.

601.56

-

2363

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

180

-

248

... More
Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall.

4200

-

2147

... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications 300 mm thick Stone/Boulder

168.74

-

2022

... More
Drainage Spouts complete as per drawing and Technical specification

70

-

2262

... More
Provide anti-corrosive paint on Concrete Surface Dekguard S300. Providing and Applying a Protective / decorative surface coating The protective coating shall be Dekguard S300 system comprising of a penetrating silane/silaxone primer followed by Dekguard S300, polymer undercoat and overcoated with Dekguard S300, aliphatic acrylate pigmented topcoat. The total dry film thickness of the coating shall be not less than 300 microns excluding primer and shall be capable of providing carbon dioxide diffusion resistance and the depth of carbonation shall be Nil, when tested at 24 hours by the accelerated carbonation test. The permeability and water absorption shall be Nil when tested at 24 hours as per BS 1881. The chloride ion diffusion shall be nil after 72 hours.Adhesive bond strength of 1.5N/mm2 (ASTM ) The coating shall be resistant to UV and weathering. Deck Slab,Girder - 2.1m,Diaphragm

13230

-

118

... More
Applying cement paint of approved quality to the surface of concrete Crash Barrier, Kerb including all labour, materials, all leads and lifts etc. complete as per drawing, Technical Specification Section 800 and as directed by the Engineer.

2389.61

-

117

... More
Kerb

-

-

-

... More
Painting of Bridge No. and span arrangement on bridge ends including all labour, materials, all leads and lifts etc. complete as per drawing, Technical Specifications Section 800 and as directed by the Engineer.

2

-

91

... More
Providing and laying 50 mm diameter heavy duty MS pipe over Crash Barrier as per IS: 1239 with expansion gap at every 20 m interval along with providing insert plate at 2 m interval, painting with single coat of zinc-rich primer and two coats of top coat epoxy paint including all labour, materials, machinery, all leads and lifts, etc. complete as per drawing, Technical Specifications Section.800 and as directed by the Engineer.

-

-

-

... More
Providing and laying 110mm dia HDPE pipe kept at 300mm above the RCC decklevel as per specification and drawing and as directedby the engineer.

788

-

191

... More
Providing and laying 100 mm PVC pipe for Duct in footpath

394

-

248

... More
Road Furniture

-

-

-

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

-

-

-

... More
a) Lane/center line/edge line/ transverse marking and any other markings. At centre lane marking Edge Lane Marking

638

-

560

... More
b) Directional Arrows / Lettering

150

-

160

... More
c) Painting diagonal, pedestrian crossings, speed breakers and kerbs

542.49

-

560

... More
Add for Intersection

124.1

-

97

... More
Painting Kerbs with approved black and white with cement paints

-

-

-

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, 2mm thick aluminium sheeting, 3mm/4mm thick Aluminum composite material sheet depending on the size of the sign fixed over back support frame of min 25x25x3mm Angle mounted on a mild steel circular pipe 65 NB ,3.2 mm thicknness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.

-

-

-

... More
Cautionary (90 cm equilateral triangle)

-

-

-

... More
Cautionary at Curves At Intersections

16

-

5756

... More
Mandatory

-

-

-

... More
At Intersections (90 cm high Octagon)

3

-

8054

... More
Informatory (80 cm x 60 cm rectangular)

3

-

6593

... More
Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming toIRC-79 and the drawings

-

-

-

... More
Cluster of Red Reflector

-

-

-

... More
At Intersections

2

-

900

... More
At Bridge

16

-

3514

... More
Providing and fixing of Raised Pavement Marker (RPM), Twin Moulded Shanks (studs) fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973 the work as directed by the Engineer–in–charge.

700

-

336

... More
Total No of BOQ ITEMS: 58 (Fifty Eight )only

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.