Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

Pradhan Mantri Gram Sadak Yojana

Doda, Jammu & Kashmir

  • Opening Date

    08 Nov 2018

  • Closing Date

    20 Nov 2018

  • Tender Amount

    ₹ 9,79,27,000

  • EMD

    ₹ 19,59,000

Summary

Construction and Maintenance of Road from L025-Sohal to Chetu, Package NoJK04-605,Regular PMGSY (Batch-I, 2018-19), Stage-II, Block Paddar, District Kishtwar

Government of Jammu and Kashmir offiCe of the Chief enGineer PmGsY (JKrrda) Jammu. notiCe invitinG e e-nit no:-CeJ/PmGsY/ Chief Engineer PMGSY (JKRRDA) Jammu on behalf of The Governor of J&K State, invites item rate basis from approved and eligible Contractors registered with J&K State Govt, CPWD, Railways or equivalent and other State Govts up to including Defect Liability & Maintenance Period of S.N o Name of Work/ Package No. N am e of th e PI U 1 2 3 1 Construction and Maintenance of Road from L039-Dudwar to Chanti, Package No:-JK04-500, Regular PMGSY (Batch-I, 2018-19), Stage-II, Block Bhalessa, District Doda (Length = 6.600 Kms) Adv. Cost excluding maintenance but inclusive of GST = Rs.344.75 Lacs T h at h ri 2 i) Construction and Maintenance of road from L027-KM 33rd RD 175 of L01 to Shingni (Gowari to Bharthi), Package No:- JK04-406, Regular PMGSY (Batch-I,2017-18), Stage II, Block Bhalessa, District Doda (Length = 7.000Kms) Adv. Cost excluding maintenance but inclusive of GST = Rs.420.27 Lacs ii)Construction and Maintenance of road from Jakias to Gandoh, Package No:-JK04-200, Phase- VIII Stage II, Block Bhalessa, District Doda (Length = 4.600Kms) Adv. Cost excluding maintenance but inclusive of GST = Rs. 237.79 Lacs -tenders 559 of 2018-19 dated:-05 05.00 PM on 20-11-2018 for each of the following works five years after construction. Co ns tt . P ar t (R s. In L ac s) M ai nt t. Pa rt (R s. In L ac s To ta l (R s. In la cs ) Cost of docu ment s (Rs in Lacs) Earne st Mone y (Rs. In Lacs) Time Allowed for complet ion 4 5 6 7 8 344.75 27.58 372.33 0.06 7.45 Months 658.06 47.89 705.95 0.060 14.12 Months Continued on Page /11/2018 fresh e-tenders on Call of tend er Time and date of ope ning of tend ers Class of contrac tor. 9 10 11 12 12 5th 1 0 .0 0 A M 2 4 -1 1 -2 0 1 8 Any registered contractor with State PWD/CPWD / Railways or equivalent qualifying eligibility criteria as provided in the Standard Bidding Documents can tender for the works 15 11 th – 2nd Page – 2nd 3 Construction and Maintenance of Road from L031-Km 60th of NH1B road to Sanourthawa Chirralla, Package No:-JK04-404, Regular PMGSY (Batch-I, 2017-18), Stage-II, Block Thathri, District Doda (Length = 15.000 Kms) Adv. Cost excluding maintenance but inclusive of GST = Rs.971.59 Lacs T h at h ri 971.59 77.73 1049.32 0.06 20.99 20 Months 5th 1 0 .0 0 A M 2 4 -1 1 -2 0 1 8 Any registered contractor with State PWD/CPWD / Railways or equivalent qualifying eligibility criteria as provided in the Standard Bidding Documents can tender for the works 4 Construction and Maintenance of Road from L032-Changa to Tantli, Package No:-JK04-421, Regular PMGSY (Batch-I, 2017-18), Stage-II, Block Bhallessa, District Doda (Length = 9.000 Kms) Adv. Cost excluding maintenance but inclusive of GST = Rs.509.81 Lacs 509.81 40.78 550.59 0.06 11.01 12 Months 5th 5 i) Construction and Maintenance of Road from L024-Sirshi to Chicha Dachhan, Package No:-JK04-487, Regular PMGSY (Batch-I, 2018-19),Stage-II, Block Marwah, District Kishtwar (Length = 3.600 Kms) Adv. Cost excluding maintenance but inclusive of GST = Rs.230.51 Lacs ii)Construction of 35 Mtr. Span Through Type Steel Truss Girder Motorable Bridge over Kiar Nallah in Km 4thRD 100-150 on Sirshi to Chicha Dachhan Road, Package No:-JK04-487A, Regular PMGSY (Batch-I, 2018-19), Block Marwah, District Kishtwar Adv. Cost including GST = Rs.154.33 Lacs M ar w ah 384.84 18.44 403.28 0.060 8.07 12 Months 5th 6 Construction and Maintenance of Road from L021-Pethgam to Renaie, Package No:-JK04-486, Regular PMGSY (Batch- I, 2018-19), Stage-II, Block Marwah, District Kishtwar (Length = 7.500 Kms) Adv. Cost excluding maintenance but inclusive of GST= Rs.48

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.