Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

Central Railway

  • Opening Date

    20 Mar 2019

  • Closing Date

    15 Apr 2019

  • Tender Amount

    ₹ 92,87,233

  • EMD

    ₹ 1,85,800

Summary

Providing Services Of Dewatering Pump Sets 27 Nos.(csmt-2, Msd-3, Mtn-1, Sin-4, Snrd-3, By-1, Crrd-1, Cla-1, Vvh-2, Gc-1, Vk-1, Mlnd-2, Tna-3, Di-1 On Main Line (khpn-1) On Tna-vsh Line Under Sr.den(s)cstm.

DRM W BB acting for and on behalf of The President of India invites E-Tenders against Tender No CR-DRMWBB-2019-10-1 Closing Date/Time 15/04/2019 11:00 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only. Manual offers are not allowed against this tender, and any such manual offer received shall be ignored. Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only payment modes available on IREPS portal like net banking, debit card, credit card etc. Manual payments through Demand draft, Banker cheque, Deposit receipts, FDR etc. are not allowed. 1. NIT HEADER Name of Work Providing services of dewatering pump sets 27 Nos.(CSMT-2, MSD-3, MTN-1, SIN-4, SNRD-3, BY-1, CRRD-1, CLA-1, VVH-2, GC-1, VK-1, MLND-2, TNA-3, DI-1 ON Main line (KHPN-1) on TNA-VSH line under Sr.DEN(S)CSTM. Bidding type Normal Tender Tender Type Open Bidding System Single Packet System Tender Closing Date Time 15/04/2019 11:00 Date Time Of Uploading Tender 20/03/2019 15:26 Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Advertised Value 9287233.20 Tendering Section SR DEN S Bidding Style [ Decision at Schedule level ] Bidding Unit Earnest Money (Rs.) 185800.00 Validity of Offer ( Days) 45 Tender Doc. Cost (Rs.) 5000.00 Period of Completion 4 Months Contract Type Works Contract Category Expenditure Bidding Start Date 01/04/2019 Are Joint Venture (JV) firms allowed to bid No Ranking Order For Bids Lowest to Highest 2. SCHEDULE S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule 1-Providing services of dewatering pump sets 27 Nos.(CSMT-2, MSD-3, MTN-1, SIN-4, SNRD-3, BY-1, CRRD-1, CLA-1, VVH-2, GC-1, VK-1, MLND-2, TNA-3, DI-1 ON Main line (KHPN-1) on TNA-VSH line under Sr.DEN(S)CSTM. 9287233.20 1 NS-1 360.00 Day 731.79 263444.40 AT Par 263444.40 Rs. Item Description:- Setting of 12.5 HP sludge diesel pumps (mud pumps) at required locations to facilitate pumping arrangements during monsoon. The pumps are to be installed at low level areas in working condition as instructed by the Engineer In-charge at site. The rate is inclusive of contractor's own 12.5 HP pumps, hose pipe (disharged pipe approx 100m), one operator/machanic /watch man for manning the pump round the clock, labour for installation, all leads, lifts, crossing of tracks, transportation, all taxes etc .complete. Whenever there are heavy rains and rise in water levels, the pumps are to be operated and dewatering is to be carried out successfully. Only diesel for operation of the pumps shall be made available by Railways free of cost. Note: Pump operator should also be provided with mobile phone round the clock. ( QTY : 03 nos for 120 days.)NOTE: Unit Day means Per pump/per day 2 NS-2 1440.00 Day 1836.52 2644588.80 AT Par 2644588.80 Rs. Item Description:- Setting of 32 HP sludge diesel pumps (mud pumps) at required locations to facilitate pumping arrangements during monsoon. The pumps are to be installed at low level areas in working condition as instructed by the Engineer In-charge at site. The rate is inclusive of contractor's own 32 HP pumps, one operator/machanic /watch man for manning the pump round the clock, labour for installation, all leads, lifts, crossing of tracks, transportation, all taxes etc .complete. Whenever there are heavy rains and rise in water levels, the pumps are to be operated and dewatering is to be carried out successfully. Only diesel for operation of the pumps shall be made available at the store o f concerned CPWI or any supervisor in- charge office in suburban section based on availability by Railways free of cost. Contractor has to made his own arrangement for transportation of fuel to site of working. Note: Penalty of Rs.10,000/- per pump per day shall be levied for non working of pump/ absence of operator or non compliance of instructions. ( QTY : 12 nos for 120 days.)NOTE: Unit Day means Per pump/Per day 3 NS

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.